S.No. Documents
1
Acceptance Testing Procedures for Digital Water Level Recorder (DWLR)
(2021.03.01)
Created By: DOWR
2
RTDAS Acceptance Testing Procedures
(2021.02.27)
Created By: NPMU and TAMC
3
2nd INTERNATIONAL CONFERENCE SUSTAINABLE WATER MANAGEMENT
(2021.02.11)
Created By: NHP,WRD Govt. of Maharashtra,
4
1st International Conference on Sustainable Water Management
(2021.02.11)
Created By: NHP,BBMB
5
GLACIAL LAKE ATLAS OF INDUS RIVER BASIN
(2021.02.11)
Created By: National Remote Sensing Centre
6
RAINFALL DATA VALIDATION
(2021.02.11)
Created By: NHP
7
HYDRO.METEOROLOG ICAL DATA DISSEMINATION POLICY, 201 8
(2021.02.11)
Created By: Ministry Of Water Resources
8
A Resource Book for Jaldoots
(2021.02.11)
Created By: CGWB,DOWR and Marvi
9
Report of the Committee for Finalizing Protocol & Software for Modeling Studies (FPSMS) under the National Hydrology Project (NHP)
(2020.11.24)
Created By: CENTRAL WATER COMMISSION
10
Report of the Committee for Finalizing Protocol & Software for Modeling Studies (FPSMS) under the National Hydrology Project (NHP)
(2020.11.24)
Created By: CENTRAL WATER COMMISSION
11
HYDROLOGIC MODELING Current Status and Future Directions
(2020.11.24)
Created By: National Institute of Hydrology, Roorkee, INDIA
12
HYDROLOGIC MODELING Current Status and Future Directions
(2020.11.24)
Created By: National Institute of Hydrology, Roorkee, INDIA
13
Hydromet Data Dissemination Policy 2018
(2020.09.26)
Created By: DOWR
14
Hydromet Data Dissemination Policy 2018
(2020.09.26)
Created By: DoWR
15
Utilizing NIC e-procurement portal
(2020.07.14)
Created By: DOWR
16
Clarification by BOC (DAVP) regarding press advertisements
(2020.07.14)
Created By: BOC (DAVP)
17
CVC guidelines not applicable for WB projects
(2020.07.14)
Created By: CVC
18
Decision Support System for Integrated Water and Crop Management dated 30th July 2019
(2019.08.08)
Created By: MoWR
19
spring manual 04-2018
(2019.07.26)
Created By: ICIMOD
20
icimod-manual
(2019.07.26)
Created By: SWID
21
Baseline survey format for NHP
(2018.06.25)
Created By: NHP
22
Inception Report May, 2018
(2018.05.24)
Created By: Project Director
23
Bidding Document
(2018.04.19)
Created By: Nagaland
24
Portable Multi-Parameter Ion Analyser
(2018.04.12)
Created By: NIH
25
Desktop Computers
(2018.04.12)
Created By: NIH
26
LNP
(2018.04.12)
Created By: NIH
27
LNP
(2018.04.12)
Created By: NIH
28
EC Probe
(2018.04.12)
Created By: NIH
29
AWLR 4 nos.
(2018.04.12)
Created By: NIH
30
Improving Irrigation Services Delivery - Panel Opening - Vivek
(2018.02.27)
Created By: Vivek Srivastava, Stuti Sharma
31
ISD-Consultation Summary
(2018.02.23)
Created By: Supriya Singh, The World Bank
32
Annex II - List of Participants
(2018.02.23)
Created By: Supriya Singh, World Bank
33
Improving Irrigation Services Delivery - Stakeholder Consultation (National Hydrology Project
(2018.02.23)
Created By: Vivek Srivastava
34
Annex VI - ISD_Resilience or Inertia
(2018.02.23)
Created By: Vivek Srivastava, World Bank
35
Institutional Models for Canal Irrigation Used Worldwide: Comparison of Select Cases
(2018.02.23)
Created By: Kirstin Iman Conti Vaibhav Chaturvedi Kangkanika Neog
36
Annex IV - O&M Financing in India
(2018.02.23)
Created By: Dr Arunabha Ghosh Chief Executive Officer Council on Energy, Environment and Water
37
Annex III -Measuring System Performance
(2018.02.22)
Created By: Dr Martin Burton, Consultant, Irrigation Management
38
Presentation on STEP - National Hydrology Project
(2017.12.08)
Created By: Team World Bank
39
METEOROLOGICAL DATA COLLECTION NETWORK OF IMD
(2017.11.16)
Created By: Team IMD
40
India WRIS - Web GIS
(2017.11.16)
Created By: Team CWC
41
Online Surface Water Information System (eSWIS)
(2017.11.16)
Created By: Team CWC
42
Module 15 – Data Management Systems
(2017.11.16)
Created By: Team World Bank
43
Module 14 – Integrated Reservoir Monitoring System
(2017.11.16)
Created By: Team World Bank
44
Module 13 – Groundwater Level Measurement
(2017.11.16)
Created By: Team World Bank
45
Module 12 – Automatic Water-Quality Monitoring
(2017.11.16)
Created By: Team World Bank
46
Module 11 –Water-Quality Lab equipment
(2017.11.16)
Created By: Team World Bank
47
Module 10 – Telemetry Options
(2017.11.16)
Created By: Team World Bank
48
Module 09 – Data Collection Platform
(2017.11.16)
Created By: Team World Bank
49
Module 08 – ADCP Deployment
(2017.11.16)
Created By: Team World Bank
50
Module 07 – Discharge measurement using Doppler Devices
(2017.11.16)
Created By: Team World Bank
51
Module 06 – Surface Water Level Measurement Instrumentation
(2017.11.16)
Created By: Team World Bank
52
Module 05 – Surface Water Monitoring - Site Selection and Datum
(2017.11.16)
Created By: Team World Bank
53
Module 04 – Automatic Weather Station and Automatic Rain Gauge
(2017.11.16)
Created By: Team World Bank
54
DATA NEEDS OF WATER SECTOR by Dr. A.K. Lohani
(2017.11.16)
Created By: Team World Bank
55
NHP_PDS_Revised_GP_CWPRS final 8 Nov 2017
(2017.11.08)
Created By: GP Division, CWPRS, Pune
56
Study of surface and subsurface water interaction using remote sensing, geohydrological and geophysical techniques and its modeling - CWPRS
(2017.10.22)
Created By: CWPRS
57
RFP Document for the TAMC
(2017.09.07)
Created By: MOWR
58
Invitation of online Expression of Interest for engaging Consulting Services for the TAMC under NHP
(2017.09.06)
Created By: MOWR
59
Presentation on NHP 1st Mission Review - Rajyasthan
(2017.09.03)
Created By: Team Rajasthan
60
Presentation on NHP 1st Mission Review - Gujarat SW
(2017.09.03)
Created By: Team Gujarat SW
61
Presentation on NHP 1st Mission Review - SOI
(2017.09.03)
Created By: Team SOI
62
Presentation on NHP 1st Mission Review - CPCB
(2017.09.03)
Created By: CPCB
63
Presentation on NHP 1st Mission Review - NRSC
(2017.09.03)
Created By: NRSC
64
Presentation on NHP 1st Mission Review - BBMB
(2017.09.03)
Created By: BBMB
65
Presentation on NHP 1st Mission Review - NIH
(2017.09.03)
Created By: NIH
66
Presentation on NHP 1st Mission Review - CGWB
(2017.09.03)
Created By: CGWB
67
Presentation on NHP 1st Mission Review - CWC
(2017.09.03)
Created By: CWC
68
Presentation on NHP 1st Mission Review - Andhra SW
(2017.09.03)
Created By: Andhra SW
69
Presentation on NHP 1st Mission Review - Andhra GW
(2017.09.03)
Created By: Andhra GW
70
Presentation on NHP 1st Mission Review - Telangana SW
(2017.09.03)
Created By: Telangana SW
71
Presentation on NHP 1st Mission Review - Telangana GW
(2017.09.03)
Created By: Telangana GW
72
Presentation on NHP 1st Mission Review - Pudducherry
(2017.09.03)
Created By: Pudducherry
73
Presentation on NHP 1st Mission Review - Maharashtra GW
(2017.09.03)
Created By: Maharashtra GW
74
Presentation on NHP 1st Mission Review - Maharashtra SW
(2017.09.03)
Created By: Maharashtra SW
75
Presentation on NHP 1st Mission Review - Karnataka
(2017.09.03)
Created By: Karnataka SW
76
Presentation on NHP 1st Mission Review - TamilNadu
(2017.09.03)
Created By: TamilNadu
77
Presentation on NHP 1st Mission Review - Kearala GW
(2017.09.03)
Created By: Kerala GW
78
Presentation on NHP 1st Mission Review - Kerala SW
(2017.09.03)
Created By: Team Kerala SW
79
Presentation on NHP 1st Mission Review - DVC
(2017.09.03)
Created By: Team DVC
80
Presentation on NHP 1st Mission Review - Goa
(2017.09.03)
Created By: Team Goa
81
Presentation on NHP 1st Mission Review - Jharkhand
(2017.09.03)
Created By: Team Jharkhand
82
Presentation on NHP 1st Mission Review - Chattisgarh - SW
(2017.09.03)
Created By: Team Chattisgarh - SW
83
Presentation on NHP 1st Mission Review - Chattisgarh - GW
(2017.09.03)
Created By: Team Chattisgarh GW
84
Presentation on NHP 1st Mission Review - Team West Bengal - SW
(2017.09.03)
Created By: Team West Bengal SW
85
Presentation on NHP 1st Mission Review - Team West Bengal - GW
(2017.09.03)
Created By: Team West Bengal GW
86
Presentation on NHP 1st Mission Review - Team Odisha - SW
(2017.09.03)
Created By: Team Odisha SW
87
Presentation on NHP 1st Mission Review - Odisha - GW
(2017.09.03)
Created By: Team Odisha GW
88
Framework Agreement for Hydro-met & Water Quality Equipment under NHP
(2017.08.27)
Created By: mowr
89
HIS manual Version 1 released during Kickoff mission
(2017.07.17)
Created By: MoWR
90
Progress Report up till December 2017 - Strategic Basin Planning for Ganga River Basin in India
(2017.07.06)
Created By: Kees Bons and Marnix van der Vat (editors) with contributions from all team members
91
Analytical Work and Technical Assistance to support Strategic Basin Planning for Ganga River Basin in India - Inception Report
(2017.07.06)
Created By: Kees Bons and Marnix van der Vat (editors) with contributions from all team members
92
Presentation - STEP (World Bank -India Office version) (003)
(2017.07.05)
Created By: Pamela, The World Bank
93
Project implementing unit - STEP NHP training
(2017.07.05)
Created By: Pamela & Hitesh Thakur , The World Bank
94
Implementing Agency - STEP Training Material
(2017.07.05)
Created By: Pamela & Hitesh Thakur , The World Bank
95
Framework for Monitoring and Evaluation (M&E)
(2017.05.24)
Created By: Dr. Anish Bansal, The World Bank
96
Presentation on Procurement Manual
(2017.05.23)
Created By: Sh Rakesh Kashyap , SJC, MoWR &RD & GR
97
Role of NIH in PDS and Capacity Building
(2017.05.23)
Created By: Dr. Sanjay Jain, NIH
98
Role of Technical Assistance & Management Committee (TAMC), Annual Work Plan 2017-2018 & its Major activities, Approval Process
(2017.05.23)
Created By: Sh Deepak Kumat SJC, Sh N.K. Manglik SJC, MoWR, RD & GR
99
Brief overview and discussions on Framework Agreement for hydro.met equipment and IWRM
(2017.05.23)
Created By: Sh Rajesh Kumar Director CWC, Sh N.K. Manglik SJC,
100
Project Management and fund flow Mechanism
(2017.05.23)
Created By: Mr. N.K. Manglik, SJC, Mowr, RD & GR
101
Institutional arrangement for success implementation of NHP
(2017.05.23)
Created By: Sh Rakesh Kashyap , SJC, MoWR &RD & GR
102
Presentation on importance of NHP and Status of activities under NHP
(2017.05.23)
Created By: Sk Deepak Kumar , SJC, MoWR, RD & GR
103
Standard Bid Document for procurement of goods under National Competitive Bidding (NCB) under e-Procurement
(2017.05.11)
Created By: World Bank
104
Training Calendar 2017-18
(2017.05.10)
Created By: MoWR, RD & GR
105
Check List for Social Screening for Civil Works in non-government land
(2017.05.03)
Created By: Ministry of Water Resources
106
Guidelines for PDS proposals
(2017.04.15)
Created By: Team NIH
107
Draft Version for SCADA system Bid
(2017.03.27)
Created By: West Bengal
108
Introduction to SCADA system
(2017.03.27)
Created By: A K Basu
109
Module on SCADA system
(2017.03.27)
Created By: A K Basu
110
Field Instruments
(2017.03.27)
Created By: A K Basu
111
Controllers
(2017.03.27)
Created By: A K Basu
112
Canal Network Control
(2017.03.27)
Created By: A K Basu
113
Performa of Application for PDS Under National Hydrology Project
(2017.03.23)
Created By: Team NIH
114
Guidelines for States for Formulation of PDS Proposal under National Hydrology Project
(2017.03.23)
Created By: Team NIH
115
Project Appraisal Document (PAD) - National Hydrology Project - Final Version February 2017
(2017.03.19)
Created By: The World Bank
116
Training on “SCADA Systems - Understanding and Bid Preparation” from 23rd to 25th March, 2017 at New Delhi
(2017.03.14)
Created By: MoWR, RD & GR
117
Standard Operating Procedure (SOP) under NHP
(2017.03.08)
Created By: NPMU, MoWR, RD & GR
118
Final List of 27 participants for the Capacity Building Workshop at NIH, Roorkee organized by BoMy, Australia
(2017.03.02)
Created By: MoWR, RD & GR
119
Approved list of trainees for “Groundwater Resources Estimation”
(2017.02.23)
Created By: NPMU, MoWR, RD & GR
120
PROCUREMENT MANUAL
(2017.02.20)
Created By: NPMU, MoWR, RD & GR
121
Approved list of trainees for the 4th training program on “River Basin Planning using HEC software” at IIT Roorkee, from 20th to 25th Feb, 2017.
(2017.02.17)
Created By: MoWR, RD & GR
122
Approved list of trainees for “Application of Surface Geophysical Techniques for Ground Water Prospecting” organised by CGWB under NHP from 20th Feb to 24th Feb, 2017
(2017.02.17)
Created By: MoWR, RD & GR
123
Domain specific training on Ground Water, being organized by Central Ground Water Board at RGNGWT&RI, Raipur-
(2017.02.08)
Created By: MoWR, RD & GR
124
Workshop on “Hydrologic Forecasting for Flood & Water Management Purposes”
(2017.02.08)
Created By: NPMU, MoWR, RD & GR
125
Presentation on STEP
(2017.01.31)
Created By: Team World Bank
126
User Guide for STEP
(2017.01.31)
Created By: Team World Bank
127
Approved list of trainees for Riverware at Ahmedabad
(2017.01.20)
Created By: NPMU, MoWR, RD & GR
128
Instructions for downloading and installing River Ware Software
(2017.01.16)
Created By: Edie
129
For jaipur training, Instructions for downloading and installing River Ware Software
(2017.01.16)
Created By: Edie
130
Document for procurement of DWLRs
(2017.01.13)
Created By: CGWB
131
Postponement the Course on HEC software from 6th 20th – 25th Feb 2017
(2017.01.10)
Created By: NPMU, MoWR, RD & GR
132
‘River Basin Planning using HEC software’ from 6th to 11th February, 2017
(2016.12.30)
Created By: NPMU, MoWR, RD & GR
133
General procurement Notice India National Hydrology Project
(2016.12.27)
Created By: DOWR
134
Bid Document for construction of Data Centre at Mohali, Punjab
(2016.12.27)
Created By: Punjab
135
Standard Bidding Document for procurement of Civil Works under NCB e-procurement one Envelope
(2016.12.19)
Created By: World Bank
136
Example Bid document for hiring man power through HR Agency
(2016.12.15)
Created By: World Bank
137
Program Brochure for Distance Learning Program in Hydrology - Basic Hydro-logical Science from 19th December 2016 to 27 January 2017.
(2016.11.30)
Created By: Datta kumar Chaskar Director & Program Co-coordinator National Water Academy, CWC
138
Letter for registration: Distance Learning (DL) Program in Hydrology - Basic Hydro logical Sciences
(2016.11.30)
Created By: D S Chaskar, Director - Designs & Program Coordinator National Water Academy (NWA)
139
Reservoir Operations in Bhakra Beas River System
(2016.11.17)
Created By: Anil Byas, BBMB
140
INTEGRATED GIS BASED WEB ENABLED DATA SET FOR WATER STAKE HOLDER DEPARTMENTS
(2016.11.17)
Created By: Public Works Department, Water Resources Department.
141
SCADA TECHNOLOGY FOR IRRIGATION MANAGEMENT IN KARNATAKA
(2016.11.17)
Created By: Water Resources Department, Govt of Karnataka
142
Presentation on Automation of Dams/Barrages in U.P. with the help of SCADA System
(2016.11.17)
Created By: Mr. Navin Kapoor, Superintending Engineer
143
India Waris - Web GIS
(2016.11.17)
Created By: Yogesh Pathainkar, CWC
144
Hydro-biological monitoring for sustainable management of Lake Chilika, Odisha
(2016.11.17)
Created By: Dr. Ritesh Kumar, Wetlands International South Asia & Dr. AjitPattnaik, Chilika Development Authority
145
WR2012 system - Water information management system for South Africa, Lesotho and Swaziland.
(2016.11.17)
Created By: Ian Rushton, Royal Haskoning DHV, Netherlands
146
Building knowledge and technology through collaborative water monitoring
(2016.11.17)
Created By: Paul Wilson, Government of Victoria , Australia
147
Promoting IWRM at national, international and cross-national level
(2016.11.17)
Created By: Hans Chr. Ammentorp, Denmark
148
NHI: the Netherlands Hydrological Instrument
(2016.11.17)
Created By: Kee Bons, Deltares, Netherlands
149
Australia Water Partners for development helping to manage water scarcity in the indo pacific
(2016.11.17)
Created By: Alluvium Consulting and AWP Partner
150
PRESENTATION on reliable data acquisition system
(2016.11.17)
Created By: PAN INDIA CONSULTANTS PVT. LTD.
151
Komoline Aerospace Limited INDIA
(2016.11.17)
Created By: Team Komoline
152
DHIs Data and Sensor strategy Data Acquisition, Management, Decision Support and Operations
(2016.11.17)
Created By: Dr. Ole Larsen, DHI
153
DHI The expert in WATER ENVIRONMENTS
(2016.11.17)
Created By: Sajid Alam-Manager MIKE Powered by DHI
154
Sutron Corporation
(2016.11.17)
Created By: Team Sutron
155
ALM Systems - Smart Instrumentation for the water industry
(2016.11.17)
Created By: Hugo Schmalz & Prakash Muthuswamy
156
Encardio-Rites ONLINE WEB BASED MONITORING OF WATER RESOURCES
(2016.11.17)
Created By: ARUSHI BHALLA & MANISH MEHTA
157
SWAN ENVIRONMENTAL
(2016.11.16)
Created By: SWAN ENVIRONMENTAL
158
SEBA Hydrometrie GmbH & Co. KG State of the Art Technology in Hydrometry
(2016.11.16)
Created By: Jens Petry
159
ALS Hydrographics at a Glance
(2016.11.16)
Created By: ALS Hydrographics
160
KISTERS at a glance
(2016.11.16)
Created By: William Steen
161
Rubicon Water Measurement, Monitoring, Control & Mgt. solutions
(2016.11.16)
Created By: Dr. Ajay Pradhan (Adviser)
162
Xylem Analytics Environmental Monitoring Systems & Solution
(2016.11.16)
Created By: Xylem Water Solutions India Pvt. Ltd.
163
Smart Digital Integrated Water Resource Management & Control System
(2016.11.16)
Created By: Mechatronics System Private Limited
164
Water Quality Acquisition System in Australia
(2016.11.16)
Created By: Chris O Neill - Hydronumerics and AWPPartner
165
Ground Water Monitoring and Data Management System in Denmark
(2016.11.16)
Created By: Ole Larsen, Danish Ground Water Forum
166
Ground Water Monitoring System in Andhra Pradesh
(2016.11.16)
Created By: Dr. Venugopal Rao Andhra Pradesh GWD
167
Hydro-Meteorological Data Acquisition System in Australia
(2016.11.16)
Created By: Paul Sheahan, Bureau of Meteorology, Australia and AWP Partner
168
Hydro-Meteorological Network Assessment and Improvement
(2016.11.16)
Created By: Levis Franky EPTISA Spain
169
National Hydrology Project
(2016.11.16)
Created By: Niraj Manglik & Avanish Kant, Ministry of Water resources, River Development and Ganga Rejuvenation
170
Theme Introductory Presentation - Hydrological Data
(2016.11.16)
Created By: Dr. Nagaraja Rao Harshadeep, Lead Environment Specialist, The World Bank
171
Letter for the approved list of trainees for the training program on River Basin Planning using waterware software
(2016.11.11)
Created By: Team NPMU
172
Blank Cancelled Cheque
(2016.11.08)
Created By: Team Karnataka Surface Water
173
Letter for training on River Basin Planning using Water-ware Software at Kolkata under National Hydrology Project
(2016.11.07)
Created By: MOWR
174
NATIONAL COMPETITIVE BIDDING FOR PROCUREMENT OF IT EQUIPMENTS FOR HYDRO INFORMATICS CENTRE
(2016.11.04)
Created By: Director, SWID
175
Notification for Waterware training at Kolkata 14-18 Nov
(2016.11.02)
Created By: MoWR
176
Constitution of CPMU and Implementation of NHP
(2016.10.21)
Created By: Surveyor General of India
177
List of e-GP systems cleared by The World Bank
(2016.10.17)
Created By: The World Bank
178
Filled template for assessment of e-Procurement by Team CWC
(2016.10.17)
Created By: Team CWC
179
Standard Bid Document for procurement of goods under NCB Non e-Procurement
(2016.10.17)
Created By: The World Bank
180
Do Letter regarding signing of memorandum of agreement inclusive program Agenda for 14th October 2016
(2016.10.06)
Created By: Team MOWR
181
APSW Signed MOA
(2016.10.05)
Created By: APSW
182
Signed copy of MOA
(2016.10.05)
Created By: Irrigation Secretary, Punjab
183
MOA signed by principle secretary and project coordinator of maharashtra
(2016.10.05)
Created By: NHP team Maharashtra (SW)
184
Invitation for International Seminar at Pune
(2016.10.05)
Created By: Team CWPRS
185
The Aide Memoire - National Hydrology Project, Appraisal Mission , August 1-5 , 2016
(2016.10.04)
Created By: The World Bank
186
Management Letter regarding Project Appraisal Mission (August 1-5 , 2016), Summarizing the missions finding and status of the project Preparations
(2016.10.04)
Created By: The World Bank
187
Memorandum of Agreement (MoA) under National Hydrology Project by Team Himachal Pradesh
(2016.10.04)
Created By: Team Himachal Pradesh
188
invitation for proposals (IFP) for empanelment of equipment supplier
(2016.09.28)
Created By: Team CWC
189
Project Brochure for National Hydrology Project, September 2016
(2016.09.27)
Created By: Team World Bank
190
Workshop brochure for International Seminar on Reliable Data Acquisition System for integrated Water Resources System
(2016.09.27)
Created By: Team CWPRS
191
Approved Memorandum of Agreement and Financial Management Guidelines under National Hydrology Project
(2016.09.17)
Created By: Team NHP
192
Government Letter (X- 94012/4/2016-NHP/1824) Training Program on Procurement Procedures
(2016.09.14)
Created By: Team MOWR - NHP
193
Letter (No X-94012/4/2016-NHP/4297)for Training on River Basin Planning using River ware software
(2016.09.08)
Created By: Team MOWR
194
Government Letter ( No. NHP/T-/2016-NIH/1003 ) regarding Surface water modelling at NIH, Belgaum under NHP
(2016.09.02)
Created By: Team NIH
195
Government Letter (No. NHP/T-/2016-NIH/1002 ) Regarding training on Basic Hydrology at CFMS, NIH, Guwahati
(2016.09.02)
Created By: Team NIH
196
Government Letter (No. NHP/T-/2016-NIH/1001), regarding Ground Water and Transport Modelling at RC, NIH, Kakinada
(2016.09.02)
Created By: Team NIH
197
Odisha-GW-PMU
(2016.09.02)
Created By: GWD,Odisha
198
A small write-up on Cloud server and its comparison with physical server
(2016.09.01)
Created By: World bank
199
HIS manual for Hydromet Systems
(2016.09.01)
Created By: World bank
200
Comparison of VSAt and INSAT Radio based satellite telemetry
(2016.08.31)
Created By: World Bank
201
Sample Implementation Arrangement Document from State of West Bengal & Telangana
(2016.08.28)
Created By: Team NHP
202
Basin-state matrix for major activities under project
(2016.08.22)
Created By: Team NHP
203
Template for bench-marking of Water Data Centers and the Water Institution
(2016.08.22)
Created By: Team NHP
204
Procurement Manual
(2016.08.21)
Created By: Team World Bank
205
Official Letter for Training on River Basin Planning using HEC software from 5th to 10th September , 2016 under NHP at IIT Roorkee
(2016.08.19)
Created By: Mr. Avanish Kant
206
Standard Procurement Document , Standard request for proposals (Trial version of electronic procurement ) Selection of Consultants V1.0 July 2012
(2016.08.17)
Created By: Team World Bank
207
Document provides the details of NRSC activities/projects under NHP and describes the deliverables and their timelines
(2016.08.15)
Created By: NRSC
208
Telangana Ground Water Proposed Organogram – NHP
(2016.08.09)
Created By: Team Telangana GW
209
Details of CPMU in CGWB
(2016.08.09)
Created By: CGWB
210
Draft framework for monitoring and evaluation indicators
(2016.08.02)
Created By: Team NHP
211
A questionnaire for Hydromet Design for reservoirs while preparing bid document
(2016.07.22)
Created By: World Bank
212
Kerala Groundwater & surface water - State PMU constituted by the Govt.of Kerala
(2016.07.21)
Created By: Director, Groundwater Department, Kerala
213
World Bank Mission Under National Hydrology Project from 1st to 5th August, 2016
(2016.07.18)
Created By: MOWR
214
Water Resource Software: APPLICATION OVERVIEW AND REVIEW
(2016.07.11)
Created By: Carter Borden
215
Office Order - Punjab
(2016.06.24)
Created By: Senior Hydrolgeologist
216
Government Order - Approval of the cabinet for the implementation of National Hydrology Project
(2016.06.23)
Created By: MOWR
217
Detail report for Implementation of NHP
(2016.06.06)
Created By: Chief Engineer, Irrigation & Flood Control, Nagaland
218
Environment Assessment - Draft Report: May 2016
(2016.05.26)
Created By: Ministry of Water Resources
219
Expression of interest (EOI) for TAMC by Ministry of Water Resources under NHP
(2016.05.18)
Created By: Ministry of Water Resources
220
Procurement of HydroMet under open framework agreement
(2016.05.18)
Created By: World Bank
221
TOR for consultancy for Extended Hydro-logic Prediction
(2016.05.18)
Created By: World Bank
222
TOR for consultancy for Sediment Modelling
(2016.05.18)
Created By: World Bank
223
The detailed Project Cost Estimate Table
(2016.05.10)
Created By: Team NHP
224
 The Detailed Project Implementation Plan (PIP) Report Project (NHP) - central as well as states
(2016.05.10)
Created By: Team NHP
225
Preparation of a Work-Plan for Year 1 and Year 2
(2016.05.10)
Created By: Team NHP
226
Preparation of a Procurement Plan for the first 18 months
(2016.05.10)
Created By: Team NHP
227
MONITORING, LEARNING AND EVALUATION
(2016.05.10)
Created By: World Bank
228
Monitoring and Evaluation (M&E) Framework for NHPOpen-house Discussions
(2016.05.10)
Created By: Chris Wald
229
Framework agreement
(2016.05.10)
Created By: Dr. Anish Bansal
230
NHP Implementation strategy
(2016.05.10)
Created By: Avanish Kant
231
Overview of Financial Management under NHP
(2016.05.10)
Created By: Krishna
232
Strategy for integrating IndiaWRIS and StateWRIS including data sharing mechanism
(2016.05.09)
Created By: Yogesh Paithankar
233
Flood forecasting and Water Resources Modelling approach under NHP (Macro & Micro River Basin Modelling)
(2016.05.09)
Created By: CPMU, Manglik
234
Example Bid Document for Surface Water
(2016.02.10)
Created By: The World Bank
235
Example Bid Document for Ground Water - DWLR
(2016.02.10)
Created By: World Bank
236
Bidding Document for Procurement of Digital Water Level Recorders (DWLR) With Telemetry
(2016.02.02)
Created By: Team NHP
237
Acceptance Checklist
(2015.11.16)
Created By: Dr. Anish Hydro-Informatics Expert, The World Bank
238
Module - Technical Specifications for RTDAS
(2015.11.15)
Created By: Dr. Anish Hydro-Informatics Expert, The World Bank
239
Technical Specifications
(2015.11.14)
Created By: Dr. Anish Hydro-Informatics Expert, The World Bank
240
Hydrological Information System - Water Level measurements
(2015.11.14)
Created By: World Bank
241
Hydrological Information System - Integrated Reservoir Monitoring System
(2015.11.14)
Created By: Dr. Anish Hydro-Informatics Expert, The World Bank
242
Hydrological Information System - Telemetry Systems
(2015.11.14)
Created By: Dr. Anish Hydro-Informatics Expert, The World Bank
243
Hydrological Information System - Discharge Measurement
(2015.11.14)
Created By: Dr. Anish Hydro-Informatics Expert, The World Bank
244
Example Hydromet Bid Document Version Part 2
(2015.11.14)
Created By: Office of the Superintending Engineer
245
Site Selection Guidelines
(2015.11.14)
Created By: Dr. Anish Hydro-Informatics Expert, The World Bank
246
Example Bid Document from state of Tamilnadu
(2015.11.14)
Created By: Dr Anish Kumar, The world Bank
247
World Bank Procurement Procedures
(2015.11.14)
Created By: Mr. Vedumurthy, World Bank
248
PROCUREMENT- Civil Works
(2015.11.14)
Created By: Mr. Vedumurthy, World Bank
249
Training Module for BIDDING DOCUMENTS - Procurement of Goods
(2015.11.14)
Created By: Team NHP
250
Preparation of Procurement Plan (PP)
(2015.11.14)
Created By: Mr. Vedumurthy, World Bank
251
Bank Procurement Guidelines
(2015.11.14)
Created By: World Bank
252
River Basin Management in Southern Africa
(2015.11.06)
Created By: World Bank
253
Global Water Challenges - A River Basin Managers Perspective
(2015.11.06)
Created By: Don Blackmore AM FTSE, (Chairman eWater –Chairman IWMI and former CE MDBC)
254
Agenda for Program visit Indian delegation from the Ministry of Water Resources and affiliated organizations
(2015.11.06)
Created By: World Bank
255
Summary Report on India National Groundwater Meeting: Scoping a National Reform Agenda
(2015.11.01)
Created By: NHP Team
256
National Hydrology Presentation for TAMC workshop 29th October 2015
(2015.10.29)
Created By: World Bank
257
Expect Further Clearance (EFC) -National Hydrology Project
(2015.10.16)
Created By: Ministry of Water Resources
258
Summary – Key messages
(2015.09.23)
Created By: World Bank
259
Space technology in MoWR
(2015.09.23)
Created By: World Bank
260
hidden treasure - Ground Water in India
(2015.09.23)
Created By: World Bank
261
Groundwater Reforms in Australia
(2015.09.23)
Created By: World Bank
262
Current Groundwater Governance & Management in India
(2015.09.23)
Created By: World Bank
263
Agenda for India Groundwater Meeting: Scoping a National Reform Agenda
(2015.09.18)
Created By: Admin - IndiaWRM
264
NHP -Mission 15th September 2015
(2015.09.15)
Created By: World Bank
265
National Hydrology Project The Way Forward
(2015.09.15)
Created By: Avanish Kant, CPMU
266
WB Mission Wrap up meeting CWPRS PIP- brief
(2015.09.15)
Created By: CWPRS
267
Institutions for River Basin Management in Australia
(2015.09.15)
Created By: World Bank
268
Presentation-Innovation in Lead Flood Forecast
(2015.09.14)
Created By: World Bank
269
National Hydrology Project – Where we stand
(2015.09.13)
Created By: NHP Team
270
NHP Structure
(2015.09.13)
Created By: World Bank
271
IWRM in River Basin
(2015.09.13)
Created By: World Bank
272
Role of MOWR in NHP
(2015.09.13)
Created By: NHP Team
273
Role of CWC in NHP
(2015.09.13)
Created By: NHP Team
274
Role of CGWB in NHP
(2015.09.13)
Created By: NHP Team
275
Role of NIH in NHP
(2015.09.13)
Created By: NHP Team
276
Role of NRSC in NHP
(2015.09.13)
Created By: NHP Team
277
World Bank Mission Under National Hydrology Project from 1st to 15th September, 2015
(2015.08.26)
Created By: NHP Team
278
Consultancy Service
(2015.07.30)
Created By: NHP Team
279
Presentation on Request for proposals - Selection of Consultants
(2015.07.29)
Created By: Mr. Arun
280
Civil Works
(2015.07.28)
Created By: NHP Team
281
Bid Evaluation -Procurement of Goods or Work
(2015.07.28)
Created By: World Bank
282
The World Bank Group, Governance Global Practice, Public Integrity and Openness Procurement Workshop
(2015.07.27)
Created By:
283
Procurements under World Bank Funded Projects
(2015.07.27)
Created By: World Bank
284
General features of Public Procurement
(2015.07.27)
Created By: Arun Kumar Kolsur
285
PROCUREMENT GUIDELINES IMPORTANT ASPECTS
(2015.07.27)
Created By: World Bank
286
PROCUREMENT NCB - CIVIL WORKS
(2015.07.27)
Created By: World Bank
287
Procurement under World Bank funded Projects
(2015.07.26)
Created By: World Bank
288
National Hydrology Project
(2015.07.24)
Created By: Dr. D.S. Chaskar, Director NWA
289
Network Design
(2015.06.24)
Created By: World Bank
290
ARG and Automatic Weather Stations
(2015.06.24)
Created By: World Bank
291
Telemetry
(2015.06.24)
Created By: World Bank
292
Integrated Reservoir Monitoring
(2015.06.24)
Created By: World Bank
293
SCADA Systems
(2015.06.24)
Created By: World Bank
294
Water Level Monitoring
(2015.06.24)
Created By: World Bank
295
Discharge Measurement
(2015.06.24)
Created By: World Bank
296
India WRIS
(2015.06.24)
Created By: World Bank
297
Database Management – eSWIS
(2015.06.24)
Created By: World Bank
298
Government Letter for Training on hydro-met network design under National Hydrology Project
(2015.06.04)
Created By: Avanish Kant
299
Module - 2 WARIS_Presentation for Kolkata
(2015.04.06)
Created By: World Bank
300
Module 3 -Meteorological data collection network of IMD
(2015.04.06)
Created By: World Bank
301
Module - 5 Presentation on online surface water system (e-SWIS)
(2015.04.06)
Created By: World Bank
302
Module 6 - Met Network Design
(2015.04.06)
Created By: World Bank
303
Module 7 - Design of Key Rain gauge Network
(2015.04.06)
Created By: World Bank
304
Module 9 - Design of hydro-met station network
(2015.04.06)
Created By: World Bank
305
Module 10 - Continuous QW Data
(2015.04.06)
Created By: World Bank
306
Module 11 - Essential Elements of a HIS
(2015.04.06)
Created By: World Bank
307
Module 12 - Overview of Hydrologic Monitoring
(2015.04.06)
Created By: World Bank
308
Module 13 - Data Management Systems
(2015.04.06)
Created By: World Bank
309
Module 14 - AWS and ARG
(2015.04.06)
Created By: World Bank
310
Module 15 - Surface-Water Instrumentation
(2015.04.06)
Created By: World Bank
311
Module 15 A - Intro to ADCPs
(2015.04.06)
Created By: World Bank
312
Module 17 - Water Quality Monitoring
(2015.04.06)
Created By: World Bank
313
Module 18 -Telemetry
(2015.04.06)
Created By: World Bank
314
Module 16 - Site Selection, Datum, and Example Stattions
(2015.04.06)
Created By: World Bank
315
Module 20 - Integrated Reservoir Monitoring
(2015.04.06)
Created By: World Bank
316
DATA NEEDS OF WATER SECTOR
(2015.04.03)
Created By: Dr. A.K. Lohani
317
Sensor Specifications Version - 1
(2015.03.04)
Created By: Dr. Anish Hydro-Informatics Expert, The World Bank
318
Standard Procurement Document for Selection of Consultants
(2015.02.27)
Created By: Team World Bank
319
Standard Bidding Document for procurement of civil works under ICB
(2015.02.27)
Created By: Team World Bank
320
Standard Bidding Document for Procurement of Goods under ICB
(2015.02.27)
Created By: Team World Bank
321
Standard Bidding Document for Procurement of Civil Works under NCB with Non e-Procurement
(2015.02.27)
Created By: Team World Bank
322
Eflows in Water Policies, Plans and Projects
(2015.02.05)
Created By: Rafik Hirji, World Bank
323
Eflow Assessment Experiences in Developing Countries
(2015.02.04)
Created By: Jay O’Keeffe, South Africa
324
River Basin Planning & Eflow Assessment Experience in China
(2015.02.04)
Created By: Robert Speed, Australia
325
Ganga River Basin – Hydrological Regime
(2015.02.04)
Created By: Dr. Sandhya Rao, IIT Delhi, tbc
326
Ganga River Basin – Socio-Economic Values
(2015.02.04)
Created By: Ritesh Kumar, Wetlands International
327
Ganga River Basin – An Ecosystem Services Perspective
(2015.02.04)
Created By: Vinod Tare, IIT Kanpur
328
EU Water Framework Directive and Eflows
(2015.02.04)
Created By: Mike Acreman, United Kingdom
329
Management of Environmental Water in the Murray-Darling
(2015.02.04)
Created By: David Papps, Australia
330
Past and ongoing Eflow Assessments
(2015.02.04)
Created By: Suresh Babu, WWF
331
Eflows Issues in Ganga Basin
(2015.02.04)
Created By: N.N. Rai, Director, Hydrology, CWC
332
PIP Preparation for HP3
(2015.02.04)
Created By: World Bank
333
Opportunities for Integrated Water Resources Management in India
(2015.02.02)
Created By: Professor Y.K. Alagh (Former-Member, Planning Commission)
334
Murray Darling Basin Experience
(2015.02.02)
Created By: Don Blackmore, Australia
335
Integrating water quality management into river basin management
(2015.02.02)
Created By: Fritz Holzwarth, Germany
336
IWRM Implementation and Capacity Development of River Basin Organization: Case of Brantas River Basin
(2015.02.02)
Created By: Indonesia Pak Tjoek, Indonesia
337
Institutional Experiences in RBOs Across Asia
(2015.02.02)
Created By: Dr Keizrul bin abdullah, Chairman NARBO
338
World Bank IWRM Initiatives in India
(2015.02.02)
Created By: Dr. William Young, World Bank
339
ADB IWRM Projects (South & South East Asia)
(2015.02.02)
Created By: Arnaud Cauchois and Clive Lyle, ADB
340
National IWRM Guidelines
(2015.02.02)
Created By: Shri A B Pandya, Chairman, CWC
341
Institutional Context for IWRM and River Basin Planning in China
(2015.02.02)
Created By: Shri M Gopalakrishnan
342
Institutional Context for IWRM and River Basin Planning in China
(2015.02.02)
Created By: Clive Lyle, Consultant, Asian Development Bank
343
Present/Future state of Water Data in India
(2015.02.02)
Created By: Shri Yogesh Paithankar, Director CWC
344
Decision Support Systems for IWRM
(2015.02.02)
Created By: Dr. R.P.Pande, NIH, Roorkee
345
Hydrological Modelling in India
(2015.02.02)
Created By: Prof A.K. Gosain, IIT Delhi
346
Environmental Flows in an IWRM Context
(2015.02.02)
Created By: Dr. Mike Acreman, CEH, UK
347
Presentation on Water resources of Maharashtra
(2015.02.02)
Created By: Dr. Suresh Kulkarni
348
An Overview of integrated water resources management in Damodar Valley Corporation (DVC)
(2015.02.02)
Created By: Shri Dipankar Chaudhary
349
Presentation on Narmada Control Authority
(2015.02.02)
Created By: Shri Mukesh Chauhan
350
Presentation on interstate water management Tungabhardra Board case study
(2015.02.02)
Created By: Dr. S K Srivastava
351
Welcome and Achievement under Hydrology Project
(2015.02.02)
Created By: Shri Avanish Kant, MoWR, RD & GR
352
Status of HP-3 PIP & Way Forward
(2015.02.02)
Created By: Dr. Anju Gaur
353
Presentation of Tamil Nadu WRIS
(2015.02.02)
Created By: Mr. S.S. Rajagopal, SWaRMA, TN
354
Integrated Water Resources Management
(2015.02.02)
Created By: Carter Borden, World Bank
355
Ideal PIP cost-table
(2015.02.02)
Created By: Johan Grijsen, World Bank
356
Agenda for National Workshop on Integrated Water Resources Management
(2015.01.23)
Created By: Admin - IndiaWRM
357
Standard Bid Document for procurement of Civil Works (W-2) under NCB (Up to US $20 Million) e-Procurement with 2 envelop system
(2015.01.01)
Created By: Team World Bank
358
PIP Write up
(2014.12.30)
Created By: World Bank
359
General Price Schedule
(2014.12.30)
Created By: World Bank
360
PIP Cost Table
(2014.12.30)
Created By: Team World Bank
361
PIP General Observations
(2014.12.30)
Created By: World Bank
362
Project Completion Report
(2014.12.30)
Created By: World Bank
363
Report on International Training Workshop
(2014.11.03)
Created By:
364
Project Completion Report on International Training Workshop
(2014.11.03)
Created By: World Bank
365
Meteosat Flow Forecasting and Drought Monitoring
(2014.09.17)
Created By: Mark de Weerd, MSc. EARS Earth Environment Monitoring BV Delft, The Netherlands
366
Welcome note – Shri. Avanish Kant, Ministry of Water Resources, River Development and Ganga Rejuvenation, Government of India
(2014.09.10)
Created By: NHP Team
367
Tools for Flood Management
(2014.09.10)
Created By: Guna Paudyal Senior Flood Management Specialist Managing Director, DHI-(India)
368
Weather analysis and forecasting in modern age An overview
(2014.09.10)
Created By: Dr. K Prasad (Rtd. DDGM, IMD) Weather Risk Ltd.
369
eWater Source
(2014.09.10)
Created By: eWater
370
Flood Management and irrigation system rehabilitation solutions in indian context
(2014.09.10)
Created By: AECOM
371
Meteosat Flow Forecasting and Drought Management
(2014.09.10)
Created By: AndriesRosema, EARS, Netherlands
372
Multiple tools and techniques for water resources management Modern Tools and Techniques for Water Resources Assessment and Management
(2014.09.10)
Created By: Geoff Podger
373
STREAM FLOW (SNOWMELT RUNOFF) MODELLING IN HIMALAYAN BASINS
(2014.09.10)
Created By: Dr. Sanjay Jain,NIH
374
Ground Management Issues of Selected river basins with special reference to Hard Rock Aquifers,NIH
(2014.09.10)
Created By: NHP Team
375
Integrated Decision Support Tools for water resources management
(2014.09.10)
Created By: Jacob Host- Madsen, DHI, Denmark
376
Flood Risk Management in Heavily Urbanized Floodplains
(2014.09.10)
Created By: Tuck Wai Lee & Mike Cope, CH2MHILL
377
Practical Systems Modelling Approach for Effective IWRM Planning and Implementation
(2014.09.10)
Created By: Tuck Wai Lee, CH2MHILL
378
Flood Risk Management in Heavily Urbanised Floodplains.
(2014.09.10)
Created By: Bryan Harvey, MEng, MBA, MICE, CEng
379
ReSyP :A package for Reservoir System Analysis& DSS for water resources planning in India
(2014.09.10)
Created By: SK Jain and MK Goel, NIH, India
380
Decision Support System Planning DSS (P)for Integrated River Basin Planning & Management,
(2014.09.10)
Created By: Dr. M.K. Goel, NIH
381
Hydrology Project Phase – III Approach towards Integrated Water Resources Management
(2014.09.04)
Created By: Narendra Kumar, Commissioner (B&B)
382
India Water Week 2015 Hydrology Project: Integrated Water Resources Management
(2014.09.04)
Created By: Dr. Anju Gaur Senior Water Resources Specialist The World Bank
383
HP-II Newsletter July 2011 - September 2011
(2011.09.30)
Created By: The World Bank
384
HP-II Newsletter October 2010 - March 2011
(2011.03.31)
Created By: The world Bank
385
Procurement Guidelines for Goods, works and Non Consulting Services
(2011.01.01)
Created By: Team World Bank
386
Procurement Guidelines - Selection and Employement of Consultant
(2011.01.01)
Created By: Team World bank