Title
|
Feedback
|
Submitted By
|
Memorandum of Agreement (MoA) under National Hydrology Project
|
|
RamaRao
|
Procurement of HydroMet under open framework agreement
|
In case of ADCP for GPS specification for giving ALTITUDE it is necessary to give the altitude with respect to mean sea level of indian reference then only it is useful.
|
Sanjay Laxman Doiphode
|
Procurement of HydroMet under open framework agreement
|
Maharashtra sw is proposing external pipe sensors for determining the discharge flowing through pipe for pipe conduits through dam for industrial/drinking/power outlet with GSM/GPRS telemetry hence it is requested to include this item in frame work aggrement. Also we have previously requested to incorporate Radial spillway gate sensors andvertical lift type gate sensors in the list of items
|
Sanjay Laxman Doiphode
|
TOR for consultancy for Flood Forecasting
|
The model should have the capacity to account for the storage in tanks(lakes) .There are around 40,000 tanks in Tamilnadu.Validation of Rainfall-Runoff model is not feasible without this.
|
The Chief Engineer, SG & SWRDC
|
Procurement of HydroMet under open framework agreement
|
In the schedule of requirement following instruments need to be added as these are proposed for procurement under our PIP
1) Automated pan Evaporometer
2) Portable water quality sonde
3) Spillway gate sensors.
|
Sanjay Laxman Doiphode
|
MONITORING, LEARNING AND EVALUATION
|
For each outcome and each output, M&E monitors several parameters but just one Lead Indicator is selected as the indicator that quickly tells stakeholders whether the key results are being attained. For each indicator, a baseline and a target are set
|
Hitesh Thakur
|
TOR for consultancy for Flood Forecasting
|
The flood forecasting consultancy would cover major river basins and main flood forecasting locations. States may have another layer of flood forecasting to incorporate sub-basins
|
Anish Kumar
|
Project Appraisal Document for National Hydrology Project
|
PAD is main project guiding document. Please check if it contains all the activities expected in the project, right from monitoring, databases, analysis, decision tools etc.
|
Anish Kumar
|
Procurement of HydroMet under open framework agreement
|
States may add more equipment to the list at later stage
|
Anish Kumar
|
MONITORING, LEARNING AND EVALUATION
|
The River Basin ToR needs to be revised for incorporating the roles of center and states clearly.
|
Anish Kumar
|