Agency wise status of the progress under Awarded, Installation and Commissioning of hydro-met stations for the month of September’21.
Monthly target and achievement for hydromets - RTDAS SW:
Sl. No. |
Agency |
Progress in September'21 |
Overall hydromet stations awarded |
Overall hydromet stations installed |
Overall hydromet stations sharing data in WIMS |
Awarded |
Installed and Commisioned |
1 |
Andhra Pradesh GW |
|
|
|
|
|
2 |
Andhra Pradesh SW |
|
|
71 |
67 |
67 |
3 |
Assam |
|
|
105 |
5 |
|
4 |
BBMB |
|
|
21 |
|
|
5 |
Bihar SW |
|
6 |
59 |
42 |
|
6 |
Chhattisgarh |
|
|
159 |
|
|
7 |
CWC |
|
|
50 |
|
|
8 |
Delhi |
|
|
|
|
|
9 |
DVC |
|
|
83 |
83 |
83 |
10 |
Goa |
|
|
34 |
12 |
12 |
11 |
Gujarat |
|
16 |
403 |
244 |
244 |
12 |
Haryana |
|
|
90 |
90 |
89 |
13 |
Himachal Pradesh |
|
|
69 |
|
|
14 |
Jharkhand |
|
1 |
56 |
49 |
48 |
15 |
Karnataka |
7 |
10 |
179 |
62 |
|
16 |
Kerala SW |
|
|
168 |
146 |
137 |
17 |
Madhya Pradesh |
|
12 |
161 |
27 |
|
18 |
Maharashtra (SW) |
|
107 |
658 |
251 |
55 |
19 |
Manipur |
|
|
34 |
|
|
20 |
Meghalaya |
|
|
30 |
|
|
21 |
Mizoram |
|
|
53 |
|
|
22 |
Nagaland |
|
|
47 |
|
|
23 |
NCA |
|
|
53 |
16 |
|
24 |
Odisha |
|
|
118 |
|
|
25 |
Puducherry |
|
|
|
|
|
26 |
Punjab |
|
|
20 |
4 |
|
27 |
Rajasthan |
|
|
247 |
247 |
237 |
28 |
Sikkim |
|
|
21 |
|
|
29 |
Tamil nadu |
|
106 |
194 |
106 |
|
30 |
Telangana (SW) |
|
3 |
27 |
19 |
19 |
31 |
Tripura |
|
|
11 |
|
|
32 |
Uttar Pradesh (SW) |
59 |
|
166 |
|
|
33 |
Uttarakhand |
|
|
108 |
|
|
34 |
West Bengal GW |
|
|
|
|
|
35 |
West Bengal SW |
|
|
153 |
|
|
|
Total
| 66 |
261 |
3648 |
1470 |
991 |
Monthly target and achievement for hydromets - RTDAS GW:
Sl. No. |
Agency |
Progress in September'21 |
Overall hydromet stations awarded |
Overall hydromet stations installed |
Overall hydromet stations sharing data in WIMS |
Awarded |
Installed and Commisioned |
1 |
Andhra Pradesh GW |
|
|
350 |
349 |
349 |
2 |
Bihar GW |
|
|
|
|
|
3 |
CGWB |
|
|
|
|
|
4 |
Chhattisgarh |
|
|
|
|
|
5 |
Delhi |
|
|
|
|
|
6 |
Gujarat |
|
29 |
1536 |
438 |
226 |
7 |
Haryana |
|
|
300 |
|
|
8 |
Himachal Pradesh |
|
|
56 |
4 |
|
9 |
Jharkhand |
|
|
117 |
|
|
10 |
Karnataka |
|
161 |
800 |
521 |
|
11 |
Kerala GW |
|
3 |
150 |
127 |
109 |
12 |
Madhya Pradesh |
|
48 |
410 |
310 |
249 |
13 |
Maharashtra GW |
|
|
|
|
|
14 |
Manipur |
|
|
|
|
|
15 |
Meghalaya |
|
|
|
|
|
16 |
Mizoram |
|
|
|
|
|
17 |
Nagaland |
|
|
|
|
|
18 |
Odisha |
|
80 |
536 |
80 |
|
19 |
Puducherry |
|
|
8 |
7 |
|
20 |
Punjab |
|
|
505 |
505 |
505 |
21 |
Rajasthan |
|
|
150 |
150 |
150 |
22 |
Tamil nadu |
|
|
386 |
386 |
316 |
23 |
Telangana GW |
|
|
240 |
240 |
239 |
24 |
Tripura |
|
|
|
|
|
25 |
Uttar Pradesh GW |
|
157 |
367 |
367 |
170 |
26 |
Uttarakhand |
|
|
|
|
|
27 |
West Bengal GW |
|
|
457 |
25 |
|
|
Total
| 0 |
478 |
6368 |
3509 |
2313 |
Assam
-
The State Data Centre will be equipped with for receiving digital real-time data from a system of telemetry instruments installed at various river sites of Assam. The received data will be further processed in the system, equipping the State Data Centre, to output different water resource data & information of the particular rivers covered in the system. The basic objective of the data center is to digitize the hydrometer logical data like water level, discharge, cross-sectional area, velocity, rainfall, suspended sediment load, etc.
Rajasthan
-
SCADA Bid Document for Chappi dam and Parbati dam has been prepared for Automatic Gate Control of Dams and Head Regulators. With the establishment of SCADA system, the automatic operation of gallery sump wells along with real-time monitoring of pond level as well as the water level cum discharge of the inflow/outflow river can also be monitored. The tenders should be floated on 30th Sep, 2021.
-
Real Time Water Quality Monitoring System at Hanumangarh: The water quality sensor and their control room equipment have been supplied at site and the installation work completed. Commissioning work is done on 09/09/21.
-
Gang & Bhakra Canal SCADA: The civil work is completed for the installation of Instruments like SCADA Control room, Gauge Hut at Cross regulator and Gauge well for water level sensor at Hanumangarh
-
Contract was signed on 8th Sep,2021 with B.S.R Corporation Pvt. Ltd. for Construction of 39 nos’ of piezometer with double cap, platform and other civil works in Udaipur.
Punjab
The signing of an agreement under the National Hydrology Project between WRD, Punjab, and M/s Wight Environmental Pvt Ltd in JV with M /s Jomiso Consulting Pvt Ltd regarding"
Development of Inflow Forecast System for Ranjit Sagar Dam and inundation mapping of downstream of Ranjit Sagar Dam project".
Haryana
The honourable Chief Minister Shri Manohar Lal Khattar, Haryana, on 18th Sept’21 has launched the RTDAS system under the NHP. Haryana WRD installed 90 Real-time Data Acquisition Systems (RTDAS) to monitor water flow in irrigation canals. The system commissioned during June 2021, uses contact-less sensors and advanced canal surveying instruments to report water-level and flow-discharge data at an hourly rate. Access to accurate information directly from the field in a timely and reliable manner has far-reaching implications in the governance and delivery of irrigation services.
Telangana
Telangana Groundwater Deptt issued a letter of award and entered into a contract agreement with M/s. PRB Infra projects Pvt Ltd. for the Construction of 152 Nos Piezometers (Bore wells) with protection works in five Districts of Southern Telangana Region as part of Ground water monitoring network improvement. The Director inaugurated the work at Medchal district and 11 piezometer drillings are completed.
CPCB
CPCB shared historical water quality data for the year 2018 under National Water Quality Monitoring Program (NWMP) to NWIC in API with JSON format for migration on the India-WRIS portal during September 2021.