1 |
Circulars |
Report of the Committee for Finalizing Protocol & Software for Modeling Studies (FPSMS) under the National Hydrology Project (NHP) |
2020/11/24 |
 |
CENTRAL WATER COMMISSION |
2 |
Circulars |
Report of the Committee for Finalizing Protocol & Software for Modeling Studies (FPSMS) under the National Hydrology Project (NHP) |
2020/11/24 |
 |
CENTRAL WATER COMMISSION |
3 |
Circulars |
HYDROLOGIC MODELING Current Status and Future Directions |
2020/11/24 |
 |
National Institute of Hydrology, Roorkee, INDIA |
4 |
Circulars |
HYDROLOGIC MODELING Current Status and Future Directions |
2020/11/24 |
 |
National Institute of Hydrology, Roorkee, INDIA |
5 |
Advisories |
Hydromet Data Dissemination Policy 2018 |
2020/09/26 |
 |
DOWR |
6 |
Circulars |
Hydromet Data Dissemination Policy 2018 |
2020/09/26 |
 |
DoWR |
7 |
Guidelines |
Utilizing NIC e-procurement portal |
2020/07/14 |
 |
DOWR |
8 |
Guidelines |
Clarification by BOC (DAVP) regarding press advertisements |
2020/07/14 |
 |
BOC (DAVP) |
9 |
Guidelines |
CVC guidelines not applicable for WB projects |
2020/07/14 |
 |
CVC |
10 |
Circulars |
Decision Support System for Integrated Water and Crop Management dated 30th July 2019 |
2019/08/08 |
 |
MoWR |
11 |
Advisories |
spring manual 04-2018 |
2019/07/26 |
 |
ICIMOD |
12 |
Advisories |
icimod-manual |
2019/07/26 |
 |
SWID |
13 |
Sanction Orders |
Baseline survey format for NHP |
2018/06/25 |
 |
NHP |
14 |
Circulars |
Inception Report May, 2018 |
2018/05/24 |
 |
Project Director |
15 |
Guidelines |
Bidding Document |
2018/04/19 |
 |
Nagaland |
16 |
Circulars |
Portable Multi-Parameter Ion Analyser |
2018/04/12 |
 |
NIH |
17 |
Guidelines |
Desktop Computers |
2018/04/12 |
 |
NIH |
18 |
Guidelines |
LNP |
2018/04/12 |
 |
NIH |
19 |
Guidelines |
LNP |
2018/04/12 |
 |
NIH |
20 |
Guidelines |
EC Probe |
2018/04/12 |
 |
NIH |
21 |
Guidelines |
AWLR 4 nos. |
2018/04/12 |
 |
NIH |
22 |
Circulars |
Improving Irrigation Services Delivery - Panel Opening - Vivek |
2018/02/27 |
 |
Vivek Srivastava, Stuti Sharma |
23 |
Circulars |
ISD-Consultation Summary |
2018/02/23 |
 |
Supriya Singh, The World Bank |
24 |
Circulars |
Annex II - List of Participants |
2018/02/23 |
 |
Supriya Singh, World Bank |
25 |
Circulars |
Improving Irrigation Services Delivery - Stakeholder Consultation (National Hydrology Project |
2018/02/23 |
 |
Vivek Srivastava |
26 |
Circulars |
Annex VI - ISD_Resilience or Inertia |
2018/02/23 |
 |
Vivek Srivastava, World Bank |
27 |
Circulars |
Institutional Models for Canal Irrigation Used Worldwide: Comparison of Select Cases |
2018/02/23 |
 |
Kirstin Iman Conti Vaibhav Chaturvedi Kangkanika Neog |
28 |
Circulars |
Annex IV - O&M Financing in India |
2018/02/23 |
 |
Dr Arunabha Ghosh Chief Executive Officer Council on Energy, Environment and Water |
29 |
Circulars |
Annex III -Measuring System Performance |
2018/02/22 |
 |
Dr Martin Burton, Consultant, Irrigation Management |
30 |
Advisories |
Presentation on STEP - National Hydrology Project |
2017/12/08 |
 |
Team World Bank |
31 |
Advisories |
METEOROLOGICAL DATA COLLECTION NETWORK OF IMD |
2017/11/16 |
 |
Team IMD |
32 |
Circulars |
India WRIS - Web GIS |
2017/11/16 |
 |
Team CWC |
33 |
Advisories |
Online Surface Water Information System (eSWIS) |
2017/11/16 |
 |
Team CWC |
34 |
Advisories |
Module 15 – Data Management Systems |
2017/11/16 |
 |
Team World Bank |
35 |
Advisories |
Module 14 – Integrated Reservoir Monitoring System |
2017/11/16 |
 |
Team World Bank |
36 |
Advisories |
Module 13 – Groundwater Level Measurement |
2017/11/16 |
 |
Team World Bank |
37 |
Advisories |
Module 12 – Automatic Water-Quality Monitoring |
2017/11/16 |
 |
Team World Bank |
38 |
Advisories |
Module 11 –Water-Quality Lab equipment |
2017/11/16 |
 |
Team World Bank |
39 |
Advisories |
Module 10 – Telemetry Options |
2017/11/16 |
 |
Team World Bank |
40 |
Circulars |
Module 09 – Data Collection Platform |
2017/11/16 |
 |
Team World Bank |
41 |
Circulars |
Module 08 – ADCP Deployment |
2017/11/16 |
 |
Team World Bank |
42 |
Circulars |
Module 07 – Discharge measurement using Doppler Devices |
2017/11/16 |
 |
Team World Bank |
43 |
Circulars |
Module 06 – Surface Water Level Measurement Instrumentation |
2017/11/16 |
 |
Team World Bank |
44 |
Circulars |
Module 05 – Surface Water Monitoring - Site Selection and Datum |
2017/11/16 |
 |
Team World Bank |
45 |
Circulars |
Module 04 – Automatic Weather Station and Automatic Rain Gauge |
2017/11/16 |
 |
Team World Bank |
46 |
Advisories |
DATA NEEDS OF WATER SECTOR by Dr. A.K. Lohani |
2017/11/16 |
 |
Team World Bank |
47 |
Circulars |
NHP_PDS_Revised_GP_CWPRS final 8 Nov 2017 |
2017/11/08 |
 |
GP Division, CWPRS, Pune |
48 |
Circulars |
Study of surface and subsurface water interaction using remote sensing, geohydrological and geophysical techniques and its modeling - CWPRS |
2017/10/22 |
 |
CWPRS |
49 |
Guidelines |
RFP Document for the TAMC |
2017/09/07 |
 |
MOWR |
50 |
Guidelines |
Invitation of online Expression of Interest for engaging Consulting Services for the TAMC under NHP |
2017/09/06 |
 |
MOWR |
51 |
Advisories |
Presentation on NHP 1st Mission Review - Rajyasthan |
2017/09/03 |
 |
Team Rajasthan |
52 |
Advisories |
Presentation on NHP 1st Mission Review - Gujarat SW |
2017/09/03 |
 |
Team Gujarat SW |
53 |
Advisories |
Presentation on NHP 1st Mission Review - SOI |
2017/09/03 |
 |
Team SOI |
54 |
Advisories |
Presentation on NHP 1st Mission Review - CPCB |
2017/09/03 |
 |
CPCB |
55 |
Advisories |
Presentation on NHP 1st Mission Review - NRSC |
2017/09/03 |
 |
NRSC |
56 |
Advisories |
Presentation on NHP 1st Mission Review - BBMB |
2017/09/03 |
 |
BBMB |
57 |
Advisories |
Presentation on NHP 1st Mission Review - NIH |
2017/09/03 |
 |
NIH |
58 |
Advisories |
Presentation on NHP 1st Mission Review - CGWB |
2017/09/03 |
 |
CGWB |
59 |
Advisories |
Presentation on NHP 1st Mission Review - CWC |
2017/09/03 |
 |
CWC |
60 |
Advisories |
Presentation on NHP 1st Mission Review - Andhra SW |
2017/09/03 |
 |
Andhra SW |
61 |
Advisories |
Presentation on NHP 1st Mission Review - Andhra GW |
2017/09/03 |
 |
Andhra GW |
62 |
Advisories |
Presentation on NHP 1st Mission Review - Telangana SW |
2017/09/03 |
 |
Telangana SW |
63 |
Advisories |
Presentation on NHP 1st Mission Review - Telangana GW |
2017/09/03 |
 |
Telangana GW |
64 |
Advisories |
Presentation on NHP 1st Mission Review - Pudducherry |
2017/09/03 |
 |
Pudducherry |
65 |
Advisories |
Presentation on NHP 1st Mission Review - Maharashtra GW |
2017/09/03 |
 |
Maharashtra GW |
66 |
Advisories |
Presentation on NHP 1st Mission Review - Maharashtra SW |
2017/09/03 |
 |
Maharashtra SW |
67 |
Advisories |
Presentation on NHP 1st Mission Review - Karnataka |
2017/09/03 |
 |
Karnataka SW |
68 |
Advisories |
Presentation on NHP 1st Mission Review - TamilNadu |
2017/09/03 |
 |
TamilNadu |
69 |
Advisories |
Presentation on NHP 1st Mission Review - Kearala GW |
2017/09/03 |
 |
Kerala GW |
70 |
Advisories |
Presentation on NHP 1st Mission Review - Kerala SW |
2017/09/03 |
 |
Team Kerala SW |
71 |
Advisories |
Presentation on NHP 1st Mission Review - DVC |
2017/09/03 |
 |
Team DVC |
72 |
Advisories |
Presentation on NHP 1st Mission Review - Goa |
2017/09/03 |
 |
Team Goa |
73 |
Advisories |
Presentation on NHP 1st Mission Review - Jharkhand |
2017/09/03 |
 |
Team Jharkhand |
74 |
Advisories |
Presentation on NHP 1st Mission Review - Chattisgarh - SW |
2017/09/03 |
 |
Team Chattisgarh - SW |
75 |
Advisories |
Presentation on NHP 1st Mission Review - Chattisgarh - GW |
2017/09/03 |
 |
Team Chattisgarh GW |
76 |
Advisories |
Presentation on NHP 1st Mission Review - Team West Bengal - SW |
2017/09/03 |
 |
Team West Bengal SW |
77 |
Advisories |
Presentation on NHP 1st Mission Review - Team West Bengal - GW |
2017/09/03 |
 |
Team West Bengal GW |
78 |
Advisories |
Presentation on NHP 1st Mission Review - Team Odisha - SW |
2017/09/03 |
 |
Team Odisha SW |
79 |
Advisories |
Presentation on NHP 1st Mission Review - Odisha - GW |
2017/09/03 |
 |
Team Odisha GW |
80 |
Advisories |
Framework Agreement for Hydro-met & Water Quality Equipment under NHP |
2017/08/27 |
 |
mowr |
81 |
Advisories |
HIS manual Version 1 released during Kickoff mission |
2017/07/17 |
 |
MoWR |
82 |
Circulars |
Progress Report up till December 2017 - Strategic Basin Planning for Ganga River Basin in India |
2017/07/06 |
 |
Kees Bons and Marnix van der Vat (editors) with contributions from all team members |
83 |
Circulars |
Analytical Work and Technical Assistance to support Strategic Basin Planning for Ganga River Basin in India - Inception Report |
2017/07/06 |
 |
Kees Bons and Marnix van der Vat (editors) with contributions from all team members |
84 |
Presentations |
Presentation - STEP (World Bank -India Office version) (003) |
2017/07/05 |
 |
Pamela, The World Bank |
85 |
Presentations |
Project implementing unit - STEP NHP training |
2017/07/05 |
 |
Pamela & Hitesh Thakur , The World Bank |
86 |
Presentations |
Implementing Agency - STEP Training Material |
2017/07/05 |
 |
Pamela & Hitesh Thakur , The World Bank |
87 |
Advisories |
Framework for Monitoring and Evaluation (M&E) |
2017/05/24 |
 |
Dr. Anish Bansal, The World Bank |
88 |
Advisories |
Presentation on Procurement Manual |
2017/05/23 |
 |
Sh Rakesh Kashyap , SJC, MoWR &RD & GR |
89 |
Advisories |
Role of NIH in PDS and Capacity Building |
2017/05/23 |
 |
Dr. Sanjay Jain, NIH |
90 |
Advisories |
Role of Technical Assistance & Management Committee (TAMC), Annual Work Plan 2017-2018 & its Major activities, Approval Process |
2017/05/23 |
 |
Sh Deepak Kumat SJC, Sh N.K. Manglik SJC, MoWR, RD & GR |
91 |
Advisories |
Brief overview and discussions on Framework Agreement for hydro.met equipment and IWRM |
2017/05/23 |
 |
Sh Rajesh Kumar Director CWC, Sh N.K. Manglik SJC, |
92 |
Advisories |
Project Management and fund flow Mechanism |
2017/05/23 |
 |
Mr. N.K. Manglik, SJC, Mowr, RD & GR |
93 |
Advisories |
Institutional arrangement for success implementation of NHP |
2017/05/23 |
 |
Sh Rakesh Kashyap , SJC, MoWR &RD & GR |
94 |
Advisories |
Presentation on importance of NHP and Status of activities under NHP |
2017/05/23 |
 |
Sk Deepak Kumar , SJC, MoWR, RD & GR |
95 |
Guidelines |
Standard Bid Document for procurement of goods under National Competitive Bidding (NCB) under e-Procurement |
2017/05/11 |
 |
World Bank |
96 |
Presentations |
Training Calendar 2017-18 |
2017/05/10 |
 |
MoWR, RD & GR |
97 |
Advisories |
Check List for Social Screening for Civil Works in non-government land |
2017/05/03 |
 |
Ministry of Water Resources |
98 |
Circulars |
Guidelines for PDS proposals |
2017/04/15 |
 |
Team NIH |
99 |
Guidelines |
Draft Version for SCADA system Bid |
2017/03/27 |
 |
West Bengal |
100 |
Advisories |
Introduction to SCADA system |
2017/03/27 |
 |
A K Basu |
101 |
Advisories |
Module on SCADA system |
2017/03/27 |
 |
A K Basu |
102 |
Circulars |
Field Instruments |
2017/03/27 |
 |
A K Basu |
103 |
Advisories |
Controllers |
2017/03/27 |
 |
A K Basu |
104 |
Advisories |
Canal Network Control |
2017/03/27 |
 |
A K Basu |
105 |
Advisories |
Performa of Application for PDS Under National Hydrology Project |
2017/03/23 |
 |
Team NIH |
106 |
Advisories |
Guidelines for States for Formulation of PDS Proposal under National Hydrology Project |
2017/03/23 |
 |
Team NIH |
107 |
Advisories |
Project Appraisal Document (PAD) - National Hydrology Project - Final Version February 2017 |
2017/03/19 |
 |
The World Bank |
108 |
Presentations |
Training on “SCADA Systems - Understanding and Bid Preparation” from 23rd to 25th March, 2017 at New Delhi |
2017/03/14 |
 |
MoWR, RD & GR |
109 |
Advisories |
Standard Operating Procedure (SOP) under NHP |
2017/03/08 |
 |
NPMU, MoWR, RD & GR |
110 |
Presentations |
Final List of 27 participants for the Capacity Building Workshop at NIH, Roorkee organized by BoMy, Australia |
2017/03/02 |
 |
MoWR, RD & GR |
111 |
Presentations |
Approved list of trainees for “Groundwater Resources Estimation” |
2017/02/23 |
 |
NPMU, MoWR, RD & GR |
112 |
Circulars |
PROCUREMENT MANUAL |
2017/02/20 |
 |
NPMU, MoWR, RD & GR |
113 |
Presentations |
Approved list of trainees for the 4th training program on “River Basin Planning using HEC software” at IIT Roorkee, from 20th to 25th Feb, 2017. |
2017/02/17 |
 |
MoWR, RD & GR |
114 |
Presentations |
Approved list of trainees for “Application of Surface Geophysical Techniques for Ground Water Prospecting” organised by CGWB under NHP from 20th Feb to 24th Feb, 2017 |
2017/02/17 |
 |
MoWR, RD & GR |
115 |
Presentations |
Domain specific training on Ground Water, being organized by Central Ground Water Board at RGNGWT&RI, Raipur- |
2017/02/08 |
 |
MoWR, RD & GR |
116 |
Presentations |
Workshop on “Hydrologic Forecasting for Flood & Water Management Purposes” |
2017/02/08 |
 |
NPMU, MoWR, RD & GR |
117 |
Circulars |
Presentation on STEP |
2017/01/31 |
 |
Team World Bank |
118 |
Presentations |
User Guide for STEP |
2017/01/31 |
 |
Team World Bank |
119 |
Presentations |
Approved list of trainees for Riverware at Ahmedabad |
2017/01/20 |
 |
NPMU, MoWR, RD & GR |
120 |
Circulars |
Instructions for downloading and installing River Ware Software |
2017/01/16 |
 |
Edie |
121 |
Presentations |
For jaipur training, Instructions for downloading and installing River Ware Software |
2017/01/16 |
 |
Edie |
122 |
Guidelines |
Document for procurement of DWLRs |
2017/01/13 |
 |
CGWB |
123 |
Presentations |
Postponement the Course on HEC software from 6th 20th – 25th Feb 2017 |
2017/01/10 |
 |
NPMU, MoWR, RD & GR |
124 |
Circulars |
‘River Basin Planning using HEC software’ from 6th to 11th February, 2017 |
2016/12/30 |
 |
NPMU, MoWR, RD & GR |
125 |
Guidelines |
General procurement Notice India National Hydrology Project |
2016/12/27 |
 |
DOWR |
126 |
Guidelines |
Bid Document for construction of Data Centre at Mohali, Punjab |
2016/12/27 |
 |
Punjab |
127 |
Guidelines |
Standard Bidding Document for procurement of Civil Works under NCB e-procurement one Envelope |
2016/12/19 |
 |
World Bank |
128 |
Guidelines |
Example Bid document for hiring man power through HR Agency |
2016/12/15 |
 |
World Bank |
129 |
Circulars |
Program Brochure for Distance Learning Program in Hydrology - Basic Hydro-logical Science from 19th December 2016 to 27 January 2017. |
2016/11/30 |
 |
Datta kumar Chaskar Director & Program Co-coordinator National Water Academy, CWC |
130 |
Circulars |
Letter for registration: Distance Learning (DL) Program in Hydrology - Basic Hydro logical Sciences |
2016/11/30 |
 |
D S Chaskar, Director - Designs & Program Coordinator National Water Academy (NWA) |
131 |
Circulars |
Reservoir Operations in Bhakra Beas River System |
2016/11/17 |
 |
Anil Byas, BBMB |
132 |
Circulars |
INTEGRATED GIS BASED WEB ENABLED DATA SET FOR WATER STAKE HOLDER DEPARTMENTS |
2016/11/17 |
 |
Public Works Department, Water Resources Department. |
133 |
Circulars |
SCADA TECHNOLOGY FOR IRRIGATION MANAGEMENT IN KARNATAKA |
2016/11/17 |
 |
Water Resources Department, Govt of Karnataka |
134 |
Circulars |
Presentation on Automation of Dams/Barrages in U.P. with the help of SCADA System |
2016/11/17 |
 |
Mr. Navin Kapoor, Superintending Engineer |
135 |
Circulars |
India Waris - Web GIS |
2016/11/17 |
 |
Yogesh Pathainkar, CWC |
136 |
Circulars |
Hydro-biological monitoring for sustainable management of Lake Chilika, Odisha |
2016/11/17 |
 |
Dr. Ritesh Kumar, Wetlands International South Asia & Dr. AjitPattnaik, Chilika Development Authority |
137 |
Circulars |
WR2012 system - Water information management system for South Africa, Lesotho and Swaziland. |
2016/11/17 |
 |
Ian Rushton, Royal Haskoning DHV, Netherlands |
138 |
Advisories |
Building knowledge and technology through collaborative water monitoring |
2016/11/17 |
 |
Paul Wilson, Government of Victoria , Australia |
139 |
Circulars |
Promoting IWRM at national, international and cross-national level |
2016/11/17 |
 |
Hans Chr. Ammentorp, Denmark |
140 |
Circulars |
NHI: the Netherlands Hydrological Instrument |
2016/11/17 |
 |
Kee Bons, Deltares, Netherlands |
141 |
Circulars |
Australia Water Partners for development helping to manage water scarcity in the indo pacific |
2016/11/17 |
 |
Alluvium Consulting and AWP Partner |
142 |
Circulars |
PRESENTATION on reliable data acquisition system |
2016/11/17 |
 |
PAN INDIA CONSULTANTS PVT. LTD. |
143 |
Circulars |
Komoline Aerospace Limited INDIA |
2016/11/17 |
 |
Team Komoline |
144 |
Circulars |
DHIs Data and Sensor strategyData Acquisition, Management, Decision Support and Operations |
2016/11/17 |
 |
Dr. Ole Larsen, DHI |
145 |
Circulars |
DHI The expert in WATER ENVIRONMENTS |
2016/11/17 |
 |
Sajid Alam-Manager MIKE Powered by DHI |
146 |
Circulars |
Sutron Corporation |
2016/11/17 |
 |
Team Sutron |
147 |
Circulars |
ALM Systems - Smart Instrumentation for the water industry |
2016/11/17 |
 |
Hugo Schmalz & Prakash Muthuswamy |
148 |
Circulars |
Encardio-Rites ONLINE WEB BASED MONITORING OF WATER RESOURCES |
2016/11/17 |
 |
ARUSHI BHALLA & MANISH MEHTA |
149 |
Circulars |
SWAN ENVIRONMENTAL |
2016/11/16 |
 |
SWAN ENVIRONMENTAL |
150 |
Circulars |
SEBA Hydrometrie GmbH & Co. KG State of the Art Technology in Hydrometry |
2016/11/16 |
 |
Jens Petry |
151 |
Circulars |
ALS Hydrographics at a Glance |
2016/11/16 |
 |
ALS Hydrographics |
152 |
Presentations |
KISTERS at a glance |
2016/11/16 |
 |
William Steen |
153 |
Circulars |
Rubicon Water Measurement, Monitoring, Control & Mgt. solutions |
2016/11/16 |
 |
Dr. Ajay Pradhan (Adviser) |
154 |
Circulars |
Xylem AnalyticsEnvironmental Monitoring Systems & Solution |
2016/11/16 |
 |
Xylem Water Solutions India Pvt. Ltd. |
155 |
Circulars |
Smart Digital Integrated Water Resource Management & Control System |
2016/11/16 |
 |
Mechatronics System Private Limited |
156 |
Circulars |
Water Quality Acquisition System in Australia |
2016/11/16 |
 |
Chris O Neill - Hydronumerics and AWPPartner |
157 |
Circulars |
Ground Water Monitoring and Data Management System in Denmark |
2016/11/16 |
 |
Ole Larsen, Danish Ground Water Forum |
158 |
Circulars |
Ground Water Monitoring System in Andhra Pradesh |
2016/11/16 |
 |
Dr. Venugopal Rao Andhra Pradesh GWD |
159 |
Advisories |
Hydro-Meteorological Data Acquisition System in Australia |
2016/11/16 |
 |
Paul Sheahan, Bureau of Meteorology, Australia and AWP Partner |
160 |
Circulars |
Hydro-Meteorological Network Assessment and Improvement |
2016/11/16 |
 |
Levis Franky EPTISA Spain |
161 |
Circulars |
National Hydrology Project |
2016/11/16 |
 |
Niraj Manglik & Avanish Kant, Ministry of Water resources, River Development and Ganga Rejuvenation |
162 |
Circulars |
Theme Introductory Presentation - Hydrological Data |
2016/11/16 |
 |
Dr. Nagaraja Rao Harshadeep, Lead Environment Specialist, The World Bank |
163 |
Presentations |
Letter for the approved list of trainees for the training program on River Basin Planning using waterware software |
2016/11/11 |
 |
Team NPMU |
164 |
Standard Operation Procedure (SOP) |
Blank Cancelled Cheque |
2016/11/08 |
 |
Team Karnataka Surface Water |
165 |
Presentations |
Letter for training on River Basin Planning using Water-ware Software at Kolkata under National Hydrology Project |
2016/11/07 |
 |
MOWR |
166 |
Guidelines |
NATIONAL COMPETITIVE BIDDING FOR PROCUREMENT OF IT EQUIPMENTS FOR HYDRO INFORMATICS CENTRE |
2016/11/04 |
 |
Director, SWID |
167 |
Presentations |
Notification for Waterware training at Kolkata 14-18 Nov |
2016/11/02 |
 |
MoWR |
168 |
Advisories |
Constitution of CPMU and Implementation of NHP |
2016/10/21 |
 |
Surveyor General of India |
169 |
Advisories |
List of e-GP systems cleared by The World Bank |
2016/10/17 |
 |
The World Bank |
170 |
Guidelines |
Filled template for assessment of e-Procurement by Team CWC |
2016/10/17 |
 |
Team CWC |
171 |
Guidelines |
Standard Bid Document for procurement of goods under NCB Non e-Procurement |
2016/10/17 |
 |
The World Bank |
172 |
Advisories |
Do Letter regarding signing of memorandum of agreement inclusive program Agenda for 14th October 2016 |
2016/10/06 |
 |
Team MOWR |
173 |
Advisories |
APSW Signed MOA |
2016/10/05 |
 |
APSW |
174 |
Advisories |
Signed copy of MOA |
2016/10/05 |
 |
Irrigation Secretary, Punjab |
175 |
Advisories |
MOA signed by principle secretary and project coordinator of maharashtra |
2016/10/05 |
 |
NHP team Maharashtra (SW) |
176 |
Presentations |
Invitation for International Seminar at Pune |
2016/10/05 |
 |
Team CWPRS |
177 |
Advisories |
The Aide Memoire - National Hydrology Project, Appraisal Mission , August 1-5 , 2016 |
2016/10/04 |
 |
The World Bank |
178 |
Advisories |
Management Letter regarding Project Appraisal Mission (August 1-5 , 2016), Summarizing the missions finding and status of the project Preparations |
2016/10/04 |
 |
The World Bank |
179 |
Advisories |
Memorandum of Agreement (MoA) under National Hydrology Project by Team Himachal Pradesh |
2016/10/04 |
 |
Team Himachal Pradesh |
180 |
Guidelines |
invitation for proposals (IFP) for empanelment of equipment supplier |
2016/09/28 |
 |
Team CWC |
181 |
Presentations |
Project Brochure for National Hydrology Project, September 2016 |
2016/09/27 |
 |
Team World Bank |
182 |
Presentations |
Workshop brochure for International Seminar on Reliable Data Acquisition System for integrated Water Resources System |
2016/09/27 |
 |
Team CWPRS |
183 |
Standard Operation Procedure (SOP) |
Approved Memorandum of Agreement and Financial Management Guidelines under National Hydrology Project |
2016/09/17 |
 |
Team NHP |
184 |
Presentations |
Government Letter (X- 94012/4/2016-NHP/1824) Training Program on Procurement Procedures |
2016/09/14 |
 |
Team MOWR - NHP |
185 |
Presentations |
Letter (No X-94012/4/2016-NHP/4297)for Training on River Basin Planning using River ware software |
2016/09/08 |
 |
Team MOWR |
186 |
Presentations |
Government Letter ( No. NHP/T-/2016-NIH/1003 ) regarding Surface water modelling at NIH, Belgaum under NHP |
2016/09/02 |
 |
Team NIH |
187 |
Presentations |
Government Letter (No. NHP/T-/2016-NIH/1002 ) Regarding training on Basic Hydrology at CFMS, NIH, Guwahati |
2016/09/02 |
 |
Team NIH |
188 |
Presentations |
Government Letter (No. NHP/T-/2016-NIH/1001), regarding Ground Water and Transport Modelling at RC, NIH, Kakinada |
2016/09/02 |
 |
Team NIH |
189 |
Advisories |
Odisha-GW-PMU |
2016/09/02 |
 |
GWD,Odisha |
190 |
Circulars |
A small write-up on Cloud server and its comparison with physical server |
2016/09/01 |
 |
World bank |
191 |
Circulars |
HIS manual for Hydromet Systems |
2016/09/01 |
 |
World bank |
192 |
Circulars |
Comparison of VSAt and INSAT Radio based satellite telemetry |
2016/08/31 |
 |
World Bank |
193 |
Advisories |
Sample Implementation Arrangement Document from State of West Bengal & Telangana |
2016/08/28 |
 |
Team NHP |
194 |
Circulars |
Basin-state matrix for major activities under project |
2016/08/22 |
 |
Team NHP |
195 |
Circulars |
Template for bench-marking of Water Data Centers and the Water Institution |
2016/08/22 |
 |
Team NHP |
196 |
Guidelines |
Procurement Manual |
2016/08/21 |
 |
Team World Bank |
197 |
Presentations |
Official Letter for Training on River Basin Planning using HEC software from 5th to 10th September , 2016 under NHP at IIT Roorkee |
2016/08/19 |
 |
Mr. Avanish Kant |
198 |
Guidelines |
Standard Procurement Document , Standard request for proposals (Trial version of electronic procurement ) Selection of Consultants V1.0 July 2012 |
2016/08/17 |
 |
Team World Bank |
199 |
Circulars |
Document provides the details of NRSC activities/projects under NHP and describes the deliverables and their timelines |
2016/08/15 |
 |
NRSC |
200 |
Advisories |
Telangana Ground Water Proposed Organogram – NHP |
2016/08/09 |
 |
Team Telangana GW |
201 |
Advisories |
Details of CPMU in CGWB |
2016/08/09 |
 |
CGWB |
202 |
Advisories |
Draft framework for monitoring and evaluation indicators |
2016/08/02 |
 |
Team NHP |
203 |
Circulars |
A questionnaire for Hydromet Design for reservoirs while preparing bid document |
2016/07/22 |
 |
World Bank |
204 |
Advisories |
Kerala Groundwater & surface water - State PMU constituted by the Govt.of Kerala |
2016/07/21 |
 |
Director, Groundwater Department, Kerala |
205 |
Advisories |
World Bank Mission Under National Hydrology Project from 1st to 5th August, 2016 |
2016/07/18 |
 |
MOWR |
206 |
Advisories |
Water Resource Software: APPLICATION OVERVIEW AND REVIEW |
2016/07/11 |
 |
Carter Borden |
207 |
Advisories |
Office Order - Punjab |
2016/06/24 |
 |
Senior Hydrolgeologist |
208 |
Advisories |
Government Order - Approval of the cabinet for the implementation of National Hydrology Project |
2016/06/23 |
 |
MOWR |
209 |
Advisories |
Detail report for Implementation of NHP |
2016/06/06 |
 |
Chief Engineer, Irrigation & Flood Control, Nagaland |
210 |
Advisories |
Environment Assessment - Draft Report: May 2016 |
2016/05/26 |
 |
Ministry of Water Resources |
211 |
Guidelines |
Expression of interest (EOI) for TAMC by Ministry of Water Resources under NHP |
2016/05/18 |
 |
Ministry of Water Resources |
212 |
Circulars |
Procurement of HydroMet under open framework agreement |
2016/05/18 |
 |
World Bank |
213 |
Circulars |
TOR for consultancy for Extended Hydro-logic Prediction |
2016/05/18 |
 |
World Bank |
214 |
Circulars |
TOR for consultancy for Sediment Modelling |
2016/05/18 |
 |
World Bank |
215 |
Circulars |
The detailed Project Cost Estimate Table |
2016/05/10 |
 |
Team NHP |
216 |
Standard Operation Procedure (SOP) |
The Detailed Project Implementation Plan (PIP) Report Project (NHP) - central as well as states |
2016/05/10 |
 |
Team NHP |
217 |
Standard Operation Procedure (SOP) |
Preparation of a Work-Plan for Year 1 and Year 2 |
2016/05/10 |
 |
Team NHP |
218 |
Standard Operation Procedure (SOP) |
Preparation of a Procurement Plan for the first 18 months |
2016/05/10 |
 |
Team NHP |
219 |
Circulars |
NHP Implementation strategy |
2016/05/10 |
 |
Avanish Kant |
220 |
Circulars |
Overview of Financial Management under NHP |
2016/05/10 |
 |
Krishna |
221 |
Circulars |
Framework agreement |
2016/05/10 |
 |
Dr. Anish Bansal |
222 |
Circulars |
MONITORING, LEARNING AND EVALUATION |
2016/05/10 |
 |
World Bank |
223 |
Presentations |
Monitoring and Evaluation (M&E) Framework for NHPOpen-house Discussions |
2016/05/10 |
 |
Chris Wald |
224 |
Circulars |
Flood forecasting and Water Resources Modelling approach under NHP (Macro & Micro River Basin Modelling) |
2016/05/09 |
 |
CPMU, Manglik |
225 |
Circulars |
Strategy for integrating IndiaWRIS and StateWRIS including data sharing mechanism |
2016/05/09 |
 |
Yogesh Paithankar |
226 |
Guidelines |
Example Bid Document for Surface Water |
2016/02/10 |
 |
The World Bank |
227 |
Guidelines |
Example Bid Document for Ground Water - DWLR |
2016/02/10 |
 |
World Bank |
228 |
Guidelines |
Bidding Document for Procurement of Digital Water Level Recorders (DWLR) With Telemetry |
2016/02/02 |
 |
Team NHP |
229 |
Advisories |
Acceptance Checklist |
2015/11/16 |
 |
Dr. Anish Hydro-Informatics Expert, The World Bank |
230 |
Guidelines |
Module - Technical Specifications for RTDAS |
2015/11/15 |
 |
Dr. Anish Hydro-Informatics Expert, The World Bank |
231 |
Guidelines |
Example Hydromet Bid Document Version Part 2 |
2015/11/14 |
 |
Office of the Superintending Engineer |
232 |
Advisories |
Site Selection Guidelines |
2015/11/14 |
 |
Dr. Anish Hydro-Informatics Expert, The World Bank |
233 |
Advisories |
Bank Procurement Guidelines |
2015/11/14 |
 |
World Bank |
234 |
Advisories |
Training Module for BIDDING DOCUMENTS - Procurement of Goods |
2015/11/14 |
 |
Team NHP |
235 |
Advisories |
Preparation of Procurement Plan (PP) |
2015/11/14 |
 |
Mr. Vedumurthy, World Bank |
236 |
Advisories |
Hydrological Information System - Integrated Reservoir Monitoring System |
2015/11/14 |
 |
Dr. Anish Hydro-Informatics Expert, The World Bank |
237 |
Advisories |
Hydrological Information System - Telemetry Systems |
2015/11/14 |
 |
Dr. Anish Hydro-Informatics Expert, The World Bank |
238 |
Advisories |
Hydrological Information System - Discharge Measurement |
2015/11/14 |
 |
Dr. Anish Hydro-Informatics Expert, The World Bank |
239 |
Advisories |
Technical Specifications |
2015/11/14 |
 |
Dr. Anish Hydro-Informatics Expert, The World Bank |
240 |
Advisories |
Hydrological Information System - Water Level measurements |
2015/11/14 |
 |
World Bank |
241 |
Guidelines |
World Bank Procurement Procedures |
2015/11/14 |
 |
Mr. Vedumurthy, World Bank |
242 |
Guidelines |
Example Bid Document from state of Tamilnadu |
2015/11/14 |
 |
Dr Anish Kumar, The world Bank |
243 |
Guidelines |
PROCUREMENT- Civil Works |
2015/11/14 |
 |
Mr. Vedumurthy, World Bank |
244 |
Advisories |
River Basin Management in Southern Africa |
2015/11/06 |
 |
World Bank |
245 |
Advisories |
Global Water Challenges - A River Basin Managers Perspective |
2015/11/06 |
 |
Don Blackmore AM FTSE, (Chairman eWater –Chairman IWMI and former CE MDBC) |
246 |
Presentations |
Agenda for Program visit Indian delegation from the Ministry of Water Resources and affiliated organizations |
2015/11/06 |
 |
World Bank |
247 |
Advisories |
Summary Report on India National Groundwater Meeting: Scoping a National Reform Agenda |
2015/11/01 |
 |
NHP Team |
248 |
Presentations |
National Hydrology Presentation for TAMC workshop 29th October 2015 |
2015/10/29 |
 |
World Bank |
249 |
Advisories |
Expect Further Clearance (EFC) -National Hydrology Project |
2015/10/16 |
 |
Ministry of Water Resources |
250 |
Advisories |
Space technology in MoWR |
2015/09/23 |
 |
World Bank |
251 |
Advisories |
hidden treasure - Ground Water in India |
2015/09/23 |
 |
World Bank |
252 |
Advisories |
Groundwater Reforms in Australia |
2015/09/23 |
 |
World Bank |
253 |
Advisories |
Current Groundwater Governance & Management in India |
2015/09/23 |
 |
World Bank |
254 |
Advisories |
Summary – Key messages |
2015/09/23 |
 |
World Bank |
255 |
Presentations |
Agenda for India Groundwater Meeting: Scoping a National Reform Agenda |
2015/09/18 |
 |
Admin - IndiaWRM |
256 |
Advisories |
National Hydrology Project The Way Forward |
2015/09/15 |
 |
Avanish Kant, CPMU |
257 |
Presentations |
WB Mission Wrap up meeting CWPRS PIP- brief |
2015/09/15 |
 |
CWPRS |
258 |
Advisories |
NHP -Mission 15th September 2015 |
2015/09/15 |
 |
World Bank |
259 |
Presentations |
Institutions for River Basin Management in Australia |
2015/09/15 |
 |
World Bank |
260 |
Presentations |
Presentation-Innovation in Lead Flood Forecast |
2015/09/14 |
 |
World Bank |
261 |
Advisories |
Role of MOWR in NHP |
2015/09/13 |
 |
NHP Team |
262 |
Presentations |
National Hydrology Project – Where we stand |
2015/09/13 |
 |
NHP Team |
263 |
Advisories |
Role of CWC in NHP |
2015/09/13 |
 |
NHP Team |
264 |
Advisories |
Role of CGWB in NHP |
2015/09/13 |
 |
NHP Team |
265 |
Advisories |
Role of NIH in NHP |
2015/09/13 |
 |
NHP Team |
266 |
Advisories |
Role of NRSC in NHP |
2015/09/13 |
 |
NHP Team |
267 |
Advisories |
IWRM in River Basin |
2015/09/13 |
 |
World Bank |
268 |
Advisories |
NHP Structure |
2015/09/13 |
 |
World Bank |
269 |
Presentations |
World Bank Mission Under National Hydrology Project from 1st to 15th September, 2015 |
2015/08/26 |
 |
NHP Team |
270 |
Advisories |
Consultancy Service |
2015/07/30 |
 |
NHP Team |
271 |
Advisories |
Presentation on Request for proposals - Selection of Consultants |
2015/07/29 |
 |
Mr. Arun |
272 |
Advisories |
Bid Evaluation -Procurement of Goods or Work |
2015/07/28 |
 |
World Bank |
273 |
Presentations |
Civil Works |
2015/07/28 |
 |
NHP Team |
274 |
Guidelines |
The World Bank Group, Governance Global Practice, Public Integrity and Openness Procurement Workshop |
2015/07/27 |
 |
|
275 |
Guidelines |
PROCUREMENT GUIDELINES IMPORTANT ASPECTS |
2015/07/27 |
 |
World Bank |
276 |
Guidelines |
PROCUREMENT NCB - CIVIL WORKS |
2015/07/27 |
 |
World Bank |
277 |
Guidelines |
General features of Public Procurement |
2015/07/27 |
 |
Arun Kumar Kolsur |
278 |
Guidelines |
Procurements under World Bank Funded Projects |
2015/07/27 |
 |
World Bank |
279 |
Guidelines |
Procurement under World Bank funded Projects |
2015/07/26 |
 |
World Bank |
280 |
Advisories |
National Hydrology Project |
2015/07/24 |
 |
Dr. D.S. Chaskar, Director NWA |
281 |
Advisories |
Database Management – eSWIS |
2015/06/24 |
 |
World Bank |
282 |
Advisories |
India WRIS |
2015/06/24 |
 |
World Bank |
283 |
Advisories |
Water Level Monitoring |
2015/06/24 |
 |
World Bank |
284 |
Advisories |
Network Design |
2015/06/24 |
 |
World Bank |
285 |
Advisories |
ARG and Automatic Weather Stations |
2015/06/24 |
 |
World Bank |
286 |
Advisories |
Telemetry |
2015/06/24 |
 |
World Bank |
287 |
Advisories |
Integrated Reservoir Monitoring |
2015/06/24 |
 |
World Bank |
288 |
Advisories |
SCADA Systems |
2015/06/24 |
 |
World Bank |
289 |
Advisories |
Discharge Measurement |
2015/06/24 |
 |
World Bank |
290 |
Advisories |
Government Letter for Training on hydro-met network design under National Hydrology Project |
2015/06/04 |
 |
Avanish Kant |
291 |
Advisories |
Module 11 - Essential Elements of a HIS |
2015/04/06 |
 |
World Bank |
292 |
Advisories |
Module 12 - Overview of Hydrologic Monitoring |
2015/04/06 |
 |
World Bank |
293 |
Advisories |
Module 13 - Data Management Systems |
2015/04/06 |
 |
World Bank |
294 |
Advisories |
Module 14 - AWS and ARG |
2015/04/06 |
 |
World Bank |
295 |
Advisories |
Module 15 - Surface-Water Instrumentation |
2015/04/06 |
 |
World Bank |
296 |
Advisories |
Module 20 - Integrated Reservoir Monitoring |
2015/04/06 |
 |
World Bank |
297 |
Advisories |
Module 17 - Water Quality Monitoring |
2015/04/06 |
 |
World Bank |
298 |
Advisories |
Module 18 -Telemetry |
2015/04/06 |
 |
World Bank |
299 |
Advisories |
Module 10 - Continuous QW Data |
2015/04/06 |
 |
World Bank |
300 |
Advisories |
Module - 2 WARIS_Presentation for Kolkata |
2015/04/06 |
 |
World Bank |
301 |
Advisories |
Module 3 -Meteorological data collection network of IMD |
2015/04/06 |
 |
World Bank |
302 |
Advisories |
Module - 5 Presentation on online surface water system (e-SWIS) |
2015/04/06 |
 |
World Bank |
303 |
Advisories |
Module 6 - Met Network Design |
2015/04/06 |
 |
World Bank |
304 |
Advisories |
Module 7 - Design of Key Rain gauge Network |
2015/04/06 |
 |
World Bank |
305 |
Advisories |
Module 9 - Design of hydro-met station network |
2015/04/06 |
 |
World Bank |
306 |
Advisories |
Module 16 - Site Selection, Datum, and Example Stattions |
2015/04/06 |
 |
World Bank |
307 |
Advisories |
Module 15 A - Intro to ADCPs |
2015/04/06 |
 |
World Bank |
308 |
Advisories |
DATA NEEDS OF WATER SECTOR |
2015/04/03 |
 |
Dr. A.K. Lohani |
309 |
Advisories |
Sensor Specifications Version - 1 |
2015/03/04 |
 |
Dr. Anish Hydro-Informatics Expert, The World Bank |
310 |
Guidelines |
Standard Bidding Document for Procurement of Goods under ICB |
2015/02/27 |
 |
Team World Bank |
311 |
Guidelines |
Standard Bidding Document for Procurement of Civil Works under NCB with Non e-Procurement |
2015/02/27 |
 |
Team World Bank |
312 |
Guidelines |
Standard Procurement Document for Selection of Consultants |
2015/02/27 |
 |
Team World Bank |
313 |
Guidelines |
Standard Bidding Document for procurement of civil works under ICB |
2015/02/27 |
 |
Team World Bank |
314 |
Advisories |
Eflows in Water Policies, Plans and Projects |
2015/02/05 |
 |
Rafik Hirji, World Bank |
315 |
Presentations |
Eflow Assessment Experiences in Developing Countries |
2015/02/04 |
 |
Jay O’Keeffe, South Africa |
316 |
Presentations |
River Basin Planning & Eflow Assessment Experience in China |
2015/02/04 |
 |
Robert Speed, Australia |
317 |
Presentations |
Ganga River Basin – Hydrological Regime |
2015/02/04 |
 |
Dr. Sandhya Rao, IIT Delhi, tbc |
318 |
Presentations |
Ganga River Basin – Socio-Economic Values |
2015/02/04 |
 |
Ritesh Kumar, Wetlands International |
319 |
Presentations |
Ganga River Basin – An Ecosystem Services Perspective |
2015/02/04 |
 |
Vinod Tare, IIT Kanpur |
320 |
Presentations |
EU Water Framework Directive and Eflows |
2015/02/04 |
 |
Mike Acreman, United Kingdom |
321 |
Presentations |
Management of Environmental Water in the Murray-Darling |
2015/02/04 |
 |
David Papps, Australia |
322 |
Presentations |
Eflows Issues in Ganga Basin |
2015/02/04 |
 |
N.N. Rai, Director, Hydrology, CWC |
323 |
Presentations |
Past and ongoing Eflow Assessments |
2015/02/04 |
 |
Suresh Babu, WWF |
324 |
Presentations |
PIP Preparation for HP3 |
2015/02/04 |
 |
World Bank |
325 |
Presentations |
Presentation on Narmada Control Authority |
2015/02/02 |
 |
Shri Mukesh Chauhan |
326 |
Presentations |
Presentation on Water resources of Maharashtra |
2015/02/02 |
 |
Dr. Suresh Kulkarni |
327 |
Presentations |
Presentation of Tamil Nadu WRIS |
2015/02/02 |
 |
Mr. S.S. Rajagopal, SWaRMA, TN |
328 |
Presentations |
Welcome and Achievement under Hydrology Project |
2015/02/02 |
 |
Shri Avanish Kant, MoWR, RD & GR |
329 |
Presentations |
An Overview of integrated water resources management in Damodar Valley Corporation (DVC) |
2015/02/02 |
 |
Shri Dipankar Chaudhary |
330 |
Advisories |
National IWRM Guidelines |
2015/02/02 |
 |
Shri A B Pandya, Chairman, CWC |
331 |
Presentations |
Decision Support Systems for IWRM |
2015/02/02 |
 |
Dr. R.P.Pande, NIH, Roorkee |
332 |
Presentations |
Hydrological Modelling in India |
2015/02/02 |
 |
Prof A.K. Gosain, IIT Delhi |
333 |
Presentations |
Integrating water quality management into river basin management |
2015/02/02 |
 |
Fritz Holzwarth, Germany |
334 |
Presentations |
IWRM Implementation and Capacity Development of River Basin Organization: Case of Brantas River Basin |
2015/02/02 |
 |
Indonesia Pak Tjoek, Indonesia |
335 |
Presentations |
Institutional Experiences in RBOs Across Asia |
2015/02/02 |
 |
Dr Keizrul bin abdullah, Chairman NARBO |
336 |
Presentations |
World Bank IWRM Initiatives in India |
2015/02/02 |
 |
Dr. William Young, World Bank |
337 |
Presentations |
ADB IWRM Projects (South & South East Asia) |
2015/02/02 |
 |
Arnaud Cauchois and Clive Lyle, ADB |
338 |
Presentations |
Institutional Context for IWRM and River Basin Planning in China |
2015/02/02 |
 |
Shri M Gopalakrishnan |
339 |
Presentations |
Institutional Context for IWRM and River Basin Planning in China |
2015/02/02 |
 |
Clive Lyle, Consultant, Asian Development Bank |
340 |
Presentations |
Present/Future state of Water Data in India |
2015/02/02 |
 |
Shri Yogesh Paithankar, Director CWC |
341 |
Presentations |
Opportunities for Integrated Water Resources Management in India |
2015/02/02 |
 |
Professor Y.K. Alagh (Former-Member, Planning Commission) |
342 |
Presentations |
Murray Darling Basin Experience |
2015/02/02 |
 |
Don Blackmore, Australia |
343 |
Presentations |
Environmental Flows in an IWRM Context |
2015/02/02 |
 |
Dr. Mike Acreman, CEH, UK |
344 |
Presentations |
Status of HP-3 PIP & Way Forward |
2015/02/02 |
 |
Dr. Anju Gaur |
345 |
Presentations |
Presentation on interstate water management Tungabhardra Board case study |
2015/02/02 |
 |
Dr. S K Srivastava |
346 |
Presentations |
Integrated Water Resources Management |
2015/02/02 |
 |
Carter Borden, World Bank |
347 |
Presentations |
Ideal PIP cost-table |
2015/02/02 |
 |
Johan Grijsen, World Bank |
348 |
Presentations |
Agenda for National Workshop on Integrated Water Resources Management |
2015/01/23 |
 |
Admin - IndiaWRM |
349 |
Guidelines |
Standard Bid Document for procurement of Civil Works (W-2) under NCB (Up to US $20 Million) e-Procurement with 2 envelop system |
2015/01/01 |
 |
Team World Bank |
350 |
Advisories |
Project Completion Report |
2014/12/30 |
 |
World Bank |
351 |
Advisories |
PIP Write up |
2014/12/30 |
 |
World Bank |
352 |
Advisories |
PIP Cost Table |
2014/12/30 |
 |
Team World Bank |
353 |
Advisories |
PIP General Observations |
2014/12/30 |
 |
World Bank |
354 |
Guidelines |
General Price Schedule |
2014/12/30 |
 |
World Bank |
355 |
Advisories |
Report on International Training Workshop |
2014/11/03 |
 |
|
356 |
Advisories |
Project Completion Report on International Training Workshop |
2014/11/03 |
 |
World Bank |
357 |
Presentations |
Meteosat Flow Forecasting and Drought Monitoring |
2014/09/17 |
 |
Mark de Weerd, MSc. EARS Earth Environment Monitoring BV Delft, The Netherlands |
358 |
Presentations |
Welcome note – Shri. Avanish Kant, Ministry of Water Resources, River Development and Ganga Rejuvenation, Government of India |
2014/09/10 |
 |
NHP Team |
359 |
Advisories |
Ground Management Issues of Selected river basins with special reference to Hard Rock Aquifers,NIH |
2014/09/10 |
 |
NHP Team |
360 |
Advisories |
STREAM FLOW (SNOWMELT RUNOFF) MODELLING IN HIMALAYAN BASINS |
2014/09/10 |
 |
Dr. Sanjay Jain,NIH |
361 |
Advisories |
ReSyP :A package for Reservoir System Analysis& DSS for water resources planning in India |
2014/09/10 |
 |
SK Jain and MK Goel, NIH, India |
362 |
Advisories |
Decision Support System Planning DSS (P)for Integrated River Basin Planning & Management, |
2014/09/10 |
 |
Dr. M.K. Goel, NIH |
363 |
Advisories |
Integrated Decision Support Tools for water resources management |
2014/09/10 |
 |
Jacob Host- Madsen, DHI, Denmark |
364 |
Advisories |
Flood Risk Management in Heavily Urbanized Floodplains |
2014/09/10 |
 |
Tuck Wai Lee & Mike Cope, CH2MHILL |
365 |
Advisories |
Practical Systems Modelling Approach for Effective IWRM Planning and Implementation |
2014/09/10 |
 |
Tuck Wai Lee, CH2MHILL |
366 |
Advisories |
Flood Risk Management in Heavily Urbanised Floodplains. |
2014/09/10 |
 |
Bryan Harvey, MEng, MBA, MICE, CEng |
367 |
Advisories |
Tools for Flood Management |
2014/09/10 |
 |
Guna Paudyal Senior Flood Management Specialist Managing Director, DHI-(India) |
368 |
Advisories |
Weather analysis and forecasting in modern age An overview |
2014/09/10 |
 |
Dr. K Prasad (Rtd. DDGM, IMD) Weather Risk Ltd. |
369 |
Advisories |
Meteosat Flow Forecasting and Drought Management |
2014/09/10 |
 |
AndriesRosema, EARS, Netherlands |
370 |
Advisories |
Multiple tools and techniques for water resources management Modern Tools and Techniques for Water Resources Assessment and Management |
2014/09/10 |
 |
Geoff Podger |
371 |
Advisories |
eWater Source |
2014/09/10 |
 |
eWater |
372 |
Presentations |
Flood Management and irrigation system rehabilitation solutions in indian context |
2014/09/10 |
 |
AECOM |
373 |
Advisories |
Hydrology Project Phase – III Approach towards Integrated Water Resources Management |
2014/09/04 |
 |
Narendra Kumar, Commissioner (B&B) |
374 |
Advisories |
India Water Week 2015 Hydrology Project: Integrated Water Resources Management |
2014/09/04 |
 |
Dr. Anju Gaur Senior Water Resources Specialist The World Bank |
375 |
Presentations |
HP-II Newsletter July 2011 - September 2011 |
2011/09/30 |
 |
The World Bank |
376 |
Presentations |
HP-II Newsletter October 2010 - March 2011 |
2011/03/31 |
 |
The world Bank |
377 |
Guidelines |
Procurement Guidelines for Goods, works and Non Consulting Services |
2011/01/01 |
 |
Team World Bank |
378 |
Guidelines |
Procurement Guidelines - Selection and Employement of Consultant |
2011/01/01 |
 |
Team World bank |